Project Controls Director · Abu Dhabi
Rishi Javeri
Project Controls Director | Programme Governance | Claims & Delay Strategy | PMO Leadership | Digital Transformation
Turning programme data into decisions that protect time, performance and delivery outcomes across major capital programmes in the UAE, GCC and India.
20+ years · AED 37B+ programme portfolio exposure · AED 21B Hudayriyat West · 25+ major programmes
In practice
What schedule assurance looks like.
Every contractor programme scored the same way, every cycle — turning schedule quality from a monthly argument into a number leadership can act on. The approach behind the 25% → 83% result on Hudayriyat West, measured against a 100-point Employer Schedule Assurance Framework.
Explore the methodology →Illustrative programme view. Start and end reflect the published 25% → 83% result; intermediate cycles are indicative, not project data.
What are you trying to solve?
Start with the problem. Go straight to the relevant check, framework, tool or case study.
Project Controls Knowledge & Tools
Methodology, tools and guidance.
Practical methodologies, case studies and professional tools for project controls, programme governance and delay strategy.
Explore the Framework
Understand the methodology — Integrity-Led Project Controls, and how the pieces connect.
Explore → AssessSchedule Health Check
A quick, deterministic self-assessment — where your programme is strong and where to look first.
Run the check → ToolkitAccess the Toolkit
Practical checklists, frameworks and reference material you can use on a live programme.
Browse → PlaybookDirector's Playbook
Practical frameworks, field notes and analytical approaches from major-programme experience.
Open →Executive snapshot
At a glance
Two decades across the region’s most complex programmes.
Expertise
The disciplines I work across.
Project Controls
Bringing time, performance, risk, change and reporting into a single, reliable view — so leadership can make decisions based on evidence rather than impression.
Programme Governance
The framework of decision rights, stage gates and assurance that keeps a programme in control.
Construction Delay Analysis & Forensic Schedule Analysis
Establishing what actually drove the completion date — and defending the days that follow it.
Construction Claims & Claims Strategy
Building — and testing — claims that survive scrutiny, before they ever reach a dispute.
Schedule Assurance
Independent validation that a programme is technically sound — before anyone trusts its dates.
Digital Project Controls
Automation and data engineering that turn schedule quality into a standard.
Case studies
Selected evidence.
291 Days Claimed, 64 Days Approved
Forensic Delay Analysis426 Days Reduced to 91
Digital Project Controls · Schedule AssuranceSchedule Quality: 25% to 83%
Project Controls LeadershipOne Controls Standard, 16 Contracts
Project Controls · Programme GovernanceAED 21B Hudayriyat West
Latest insights
Technical thinking, in depth.
The Critical Path: Where Time Really Lives
The critical path is the sequence that actually determines your completion date — the longest path through the logic, carrying the least float. Delay to it delays the job; delay to anything with float doesn't, until the float runs out. And 'critical' isn't a badge the software hands out — it's the path currently driving the finish, and it can move.
Construction ClaimsExtension of Time: What Are You Actually Measuring?
An extension of time isn't a reward for a project running late. It measures one specific thing — the effect of Employer Risk Events on the critical path to a contractual completion milestone. It nets out your own delays, it doesn't automatically hand you money, and it protects the Employer too by keeping the completion date alive.
Delay AnalysisProspective vs Retrospective Delay Analysis
Two competent analysts, the same events, the same records, different awards — because they stood in different places to look. The choice between a prospective and a retrospective stance is one of the most consequential and least examined decisions in a delay claim.
Areas of practice
What I bring to a programme.
Programme Controls Leadership
Building and leading high-performing project controls functions across complex capital programmes.
Programme Governance
Transparent reporting, assurance and escalation structures that keep leadership decisions evidence-based.
Schedule & Delay
Independent assessment of programme performance, critical path and delay.
Claims Strategy
Evidence-led EOT and claims assessment that stands up to independent scrutiny.
Digital Project Controls
Automation, schedule analytics and digital assurance — including Python-based P6 quality engines.
Executive Decision Support
Turning complex programme data into clear, defensible management decisions.
Common questions
Project controls, in plain terms.
Who is Rishi Javeri?
Rishi Javeri is a Project Controls Director with 20+ years of experience and AED 37B+ programme portfolio exposure across major UAE and GCC capital programmes. His expertise spans project controls leadership, planning and Primavera P6, schedule assurance, claims and delay strategy, programme governance, PMO leadership and digital project controls.
What does a Project Controls Director do?
A Project Controls Director leads the integrated control of a programme’s time, cost, risk, change and performance — establishing the planning, scheduling, reporting and assurance frameworks that let leadership decide on evidence, and turning complex programme data into clear management action.
What is schedule assurance?
Schedule assurance is the independent validation that a programme’s baseline is technically sound and reliable before its dates are trusted — testing logic, float, constraints, durations and progress against a defined standard such as the DCMA 14-point checks.
Is the 100-point Employer Schedule Assurance Framework the same as the DCMA 14-point assessment?
No. The DCMA 14-point checks are a recognised schedule-quality reference — logic, constraints, float, durations and critical-path characteristics. The 100-point Employer Schedule Assurance Framework is a broader, programme-specific assurance structure developed and applied by Rishi Javeri, covering wider compliance, quality and governance. The 25% → 83% schedule assurance score is measured against the 100-point framework, not a DCMA score, and neither is an externally certified industry standard.
What is an Extension of Time (EOT) assessment?
An EOT assessment determines whether a contractor is entitled to move the contractual completion date because of a delay that is not their risk. It traces the delaying event along the critical path to establish the days that genuinely delayed completion — a question of time, separate from any entitlement to cost.
What is forensic delay analysis?
Forensic delay analysis reconstructs, from the programme and contemporaneous records, how specific events affected completion — using recognised methods such as time impact analysis, windows, as-planned versus as-built and collapsed as-built, chosen to fit the records so the result is reproducible and defensible.
Get in touch
Discuss Project Controls, Programme Governance, Schedule Assurance or Claims Strategy.