Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Abu Dhabi, UAE

Rishi Javeri – Project Controls & Programme Governance Leader

Senior Programme Controls Manager | Integrated Programme Controls | Schedule Assurance | Claims & Delay Analysis

Senior Programme Controls Manager with experience since 2007, contributing to the governance and delivery of major construction and infrastructure programmes with an overall portfolio exceeding AED 44 billion.

Currently with EllisDon (PMC) on Modon’s AED 28.1B Hudayriyat West Island Development, Abu Dhabi · Open to Director-level opportunities across the UAE, GCC and India

Rishi Javeri, project controls and programme governance leader, Abu Dhabi

Where to start

Recruiters and executive search

  1. Executive profileRole, scale, results and credentials
  2. Download executive CVTwo pages, PDF
  3. Executive enquiryOr connect on LinkedIn

Programme directors, employers and PMCs

  1. ExpertiseWhat each discipline covers
  2. Case studiesQuantified, with the method shown
  3. MethodologyOr start from a problem in the Decision Centre
  4. Professional enquirySee How I Work first

In practice

What schedule assurance looks like.

Every contractor programme scored the same way, every cycle — turning schedule quality from a monthly argument into a number leadership can act on. The approach behind the 25% → 83% result on a Hudayriyat West package programme, measured against a 100-point Employer Schedule Assurance Framework.

  1. Assurance
  2. Diagnosis
  3. Rectification
  4. Monitoring
  5. Management decision

The 100-point Employer framework scores each programme; the DCMA 14-point checks sit within it as a recognised schedule-quality reference.

Explore the methodology →
Example dashboard view Illustrative data · not a live feed
83%
Schedule Assurance Score
Dimensions
6
Open ends
0
Float health
Healthy
Assurance score
— a Schedule Assurance Score on the framework’s 100-point scale (not a DCMA score). It does not show whether the dates will be achieved.
Open ends
— whether every activity is logic-linked; not whether the logic itself is right.
Float health
— whether float behaves sensibly; not who owns it or what caused a change.

Illustrative programme view. Start and end reflect the published 25% → 83% result; intermediate cycles are indicative, not project data.

What are you trying to solve?

Start with the problem. Go straight to the relevant check, framework, tool or case study.

A Baseline doesn't look reliable
5-Minute Baseline Check →
B Contractor programme doesn't look credible
Schedule Health Check →
C I've received an EOT / delay claim
EOT Triage →
D Recovery programme looks unrealistic
Recovery Programme Check →
E Management doesn't trust the dashboard
Executive Dashboard Check →
F I need to establish project controls
Project Controls Setup Check →

Open the full Decision Centre →

Case studies

Selected evidence.

Forensic Delay Analysis · EOT
291 → 64

291 Days Claimed, 64 Days Approved

Context
Riyadh City Infrastructure Programme, Abu Dhabi — the infrastructure-handover milestone.
Challenge
A 291-day extension-of-time claim built on 17 delay events across 9 milestones, most framed identically.
Method
Retrospective, windowed analysis with rules fixed in advance; each event tested against the contemporaneous record and the path driving the affected milestone.
Result
64 days approved. Independent assessments by the Engineer (66 days) and a forensic specialist (60 days) landed within a six-day band.
Read the case study →
Forensic Delay Analysis
426 → 91

426 Days Reduced to 91

Context
Hudayriyat West velodrome, Abu Dhabi — the Engineer's assessment on the Employer's behalf.
Challenge
A 426-day EOT position to final completion, built from 16 delay events across design, procurement and construction.
Method
Windowed longest-path analysis across nine windows, tracking the driving path as it moved; each event tested against the contract and the record.
Result
91 days approved on the evidence, with every rejected day tied to a recorded reason.
Read the case study →
Digital Project Controls · Schedule Assurance
25% → 83%

Schedule Quality: 25% to 83%

Context
One package programme on Hudayriyat West, Abu Dhabi: the contractor's baseline and revised programmes.
Challenge
Initial conformance of around 25% against the 100-Point Employer Schedule Assurance Framework — schedules not reliable for progress, forecasting or decisions.
Method
Every submission run through a Python and Primavera P6 assurance engine against the 100-point framework, with DCMA 14-point checks as a supporting reference; structured comments closed out each cycle.
Result
Conformance rose to over 83% against the 100-point framework and held. It is a programme-specific measure, not a DCMA score or an external benchmark.
Read the case study →
Project Controls Leadership
16 → 1

One Controls Standard, 16 Contracts

Context
AED 13.47B urban-infrastructure programme, Abu Dhabi — Employer-side Programme Planning Manager.
Challenge
16 contracts and 14 independently built schedules with inconsistent coding, and the interfaces that drive the programme missing from all of them.
Method
A common standard — coding, a fragnet library and interface capture — and a reconciled master programme of 15,000+ activities, with a team of twelve senior planners.
Result
One governable programme environment, with comparable information across every contract.
Read the case study →
Project Controls · Programme Governance
AED 28.1B

AED 28.1B Hudayriyat West

Context
AED 28.1B island development in Abu Dhabi, delivered through seven concurrent construction packages; integrated controls led within the EllisDon PMC.
Challenge
Each package used its own methodology, software, WBS and reporting format, so there was no reconciled programme picture to decide on.
Method
A Project Controls Framework and procedures manual as one common standard, a federated P6 environment and 100-point assurance every cycle.
Result
A single reconciled programme picture; the standard adopted as the Employer's template; a planning function of fifteen professionals.
Read the case study →

Credentials

↗ Independently verifiable  ·  CIArb, PMI, CIOB, APM & IEI (Fellow, membership no. F-1334529)

Common questions

Project controls, in plain terms.

Who is Rishi Javeri?

Rishi Javeri is a project controls and programme governance leader based in Abu Dhabi, working in project controls since 2007 on programmes with an overall portfolio exceeding AED 44 billion. He currently serves as Senior Programme Controls Manager at EllisDon, leading integrated controls on the Hudayriyat West programme. His expertise and leadership scope support his positioning for Project Controls Director, Head of Project Controls and PMO leadership roles.

What does a Project Controls Director do?

A Project Controls Director leads the integrated control of a programme’s time, cost, risk, change and performance — establishing the planning, scheduling, reporting and assurance frameworks that let leadership decide on evidence, and turning complex programme data into clear management action.

What is schedule assurance?

Schedule assurance is the independent validation that a programme’s baseline is technically sound and reliable before its dates are trusted — testing logic, float, constraints, durations and progress against a defined standard such as the DCMA 14-point checks.

Is the 100-point Employer Schedule Assurance Framework the same as the DCMA 14-point assessment?

No. The DCMA 14-point checks are a recognised schedule-quality reference — logic, constraints, float, durations and critical-path characteristics. The 100-point Employer Schedule Assurance Framework is a broader, programme-specific assurance structure developed and applied by Rishi Javeri, covering wider compliance, quality and governance. The 25% → 83% schedule assurance score is measured against the 100-point framework, not a DCMA score, and neither is an externally certified industry standard.

What is an Extension of Time (EOT) assessment?

An EOT assessment determines whether a contractor is entitled to move the contractual completion date because of a delay that is not their risk. It traces the delaying event along the critical path to establish the days that genuinely delayed completion — a question of time, separate from any entitlement to cost.

What is forensic delay analysis?

Forensic delay analysis reconstructs, from the programme and contemporaneous records, how specific events affected completion — using recognised methods such as time impact analysis, windows, as-planned versus as-built and collapsed as-built, chosen to fit the records so the result is reproducible and defensible.

Where is Rishi Javeri based?

Rishi Javeri is based in Abu Dhabi, United Arab Emirates, and works across the UAE, GCC and India.

Senior opportunities

Considering senior project controls leadership opportunities?

Open to discussions regarding Project Controls Director, Head of Project Controls and senior programme leadership opportunities across the UAE, GCC and India.

I welcome confidential discussions with executive recruiters, search consultants and organisations seeking experienced project controls leadership.

Professional enquiries

For professional discussions on project controls, programme governance, schedule assurance or claims and delay methodology.

Send a professional enquiry →