Baseline Review Checklist

Purpose

Verify a contractor's baseline programme is technically sound before you accept it — because the baseline you accept is the one you'll be measured against.

Who it’s for

Employer / PMC project controls, planners and PMs reviewing a submitted baseline.

When to use it

On first baseline submission, and on any re-baseline or major revision.

Key areas covered
  • Submission & WBS
  • Contractual compliance
  • Logic, constraints & float
  • Critical path
  • Resource & cost loading
  • P6 hygiene
Related framework Baseline Integrity →
Download PDF ↓ // Tick items on screen for your own review
Download the full PDF checklist ↓ 100 checks across 12 areas · print-ready · free to use with attribution

What to verify before you accept a contractor’s baseline programme — because the baseline you accept is the one you will be measured against. The summary below is the shape of it; the downloadable PDF is the full working checklist with Yes / No / N/A columns.

  • Scope & structure — complete against contract; logical WBS and coding.
  • Logic — no open ends; predominantly finish-to-start; the network responds when a key activity moves.
  • Critical path — runs through genuinely constraining work; reconciled against the longest path.
  • Constraints & calendars — every hard constraint justified; no unexplained negative float.
  • Durations & resources — realistic, with a resourcing basis.
  • Acceptance — recorded as a sound measure of record, not agreement on dates.