Director’s judgement

The Director’s 10-Minute Review

Before accepting any reported position, an experienced Project Controls Director runs the same short interrogation. Not a checklist to complete — a way of thinking: what is claimed, what the programme actually shows, and the one question that decides it. Here is that review across the six situations that matter most.

Baseline

Run the Baseline Check →
01
What is being reported?

An accepted baseline, presented as the programme of record.

02
What evidence supports it?

Contract acceptance, the logic network, the constraint log, the basis of durations.

03
What assumption needs challenging?

That acceptance means the baseline is sound enough to control against.

04
What does the programme actually show?

Whether there are open ends, hard constraints driving dates, and a critical path that reflects how the job will be built.

05
What is driving the outcome?

Whether the dates are held by logic or by constraints.

06
What could invalidate the conclusion?

A logic-driven critical path that makes engineering sense would settle it; its absence undermines everything measured against it.

07
What needs checking next?

Score it against the 100-point framework — logic, constraints, float, critical path.

08
What management decision could this change?

Whether to accept the baseline as the control reference, or require correction first.

The Director’s question

“If I measure delay against this baseline tomorrow, will the answer be defensible?”

Progress

Run the Schedule Health Check →
01
What is being reported?

A percentage complete and a set of actual dates.

02
What evidence supports it?

Site records, quantities, and the contemporaneous programme.

03
What assumption needs challenging?

That the reported percentage reflects physical progress on the work that matters.

04
What does the programme actually show?

Whether actuals reconcile, and whether progress is on the critical work or the easy scope.

05
What is driving the outcome?

The progress method, and whether it is applied consistently each cycle.

06
What could invalidate the conclusion?

Unevidenced progress, or progress concentrated off the critical path.

07
What needs checking next?

Reconcile reported actuals against the record; test progress on the high-risk scope.

08
What management decision could this change?

Whether reported progress can be trusted to drive the forecast and any claim.

The Director’s question

“Is this progress, or is it just activity?”

Forecast

Check forecast integrity →
01
What is being reported?

A forecast completion date.

02
What evidence supports it?

Remaining durations, the longest path, float distribution, the logic.

03
What assumption needs challenging?

That the forecast date is calculated, not chosen.

04
What does the programme actually show?

Whether the date is held by logic and remaining duration, or by a constraint.

05
What is driving the outcome?

The critical path and the remaining-duration assumptions.

06
What could invalidate the conclusion?

A constraint holding the date; remaining durations untouched while the job slips.

07
What needs checking next?

Trace the driving path; test remaining durations against actual productivity.

08
What management decision could this change?

Whether the completion date can be planned and committed against.

The Director’s question

“Is this date a calculation, or a hope?”

Recovery Programme

Run the Recovery Programme Check →
01
What is being reported?

A recovery programme showing the job back on the contractual date.

02
What evidence supports it?

The method behind shortened durations, the secured resources, the logic changes.

03
What assumption needs challenging?

That the recovery is achievable, not just drawn.

04
What does the programme actually show?

Whether logic was relaxed, durations compressed without basis, or float stripped.

05
What is driving the outcome?

The assumed productivity and resource levels.

06
What could invalidate the conclusion?

A rate the job has never achieved; a date held by a constraint.

07
What needs checking next?

Test the mechanics — logic, durations, resources, critical path, achievability.

08
What management decision could this change?

Whether to accept the recovery as credible, or reject it and escalate.

The Director’s question

“Is this actually a recovery programme, or simply a different forecast?”

EOT / Delay

Run the EOT Triage →
01
What is being reported?

An extension-of-time claim of a given number of days.

02
What evidence supports it?

The baseline, the updates, the instruction and notice record, the delay-event particulars.

03
What assumption needs challenging?

That the claimed delay equals demonstrable programme impact.

04
What does the programme actually show?

Whether each event sits on the critical path to the affected milestone, in its window.

05
What is driving the outcome?

Cause, criticality and contractual validity — together.

06
What could invalidate the conclusion?

Events off the driving path; the contractor’s own delay; no valid notice.

07
What needs checking next?

Screen each event for validity, then test cause and criticality in the contemporaneous programme.

08
What management decision could this change?

What extension is actually demonstrable — and whether time and money are kept separate.

The Director’s question

“Is this a claimed delay, or a demonstrable programme impact?”

Programme Governance

Run the Setup Check →
01
What is being reported?

A consolidated programme status across contracts.

02
What evidence supports it?

Coding and calendar consistency, roll-up capability, the escalation record.

03
What assumption needs challenging?

That the consolidated picture is actually comparable across contracts.

04
What does the programme actually show?

Whether the contracts share a standard, or the roll-up hides inconsistency.

05
What is driving the outcome?

Whether one common controls standard exists across the packages.

06
What could invalidate the conclusion?

Divergent coding and methods that make the roll-up meaningless.

07
What needs checking next?

Test whether status can be compared and exposure rolled up; check the escalation path.

08
What management decision could this change?

What to standardise across contracts, and what to escalate now.

The Director’s question

“Am I governing one programme, or several that happen to share a cover page?”

Read → Apply → See

The method behind these reviews: 100-Point Framework · Director’s Playbook · Case Studies · Controls Red Flags