Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Diagnostic · Setup

Project Controls Setup Check

Seven quick questions on whether the controls foundations are in place before a programme scales — because retrofitting a standard later is far harder. It runs entirely in your browser — nothing is sent or stored. It is a practitioner’s prompt, not an engineering or contractual certification.

01Is there a defined controls standard — WBS, coding, calendars and progress rules — before baselines are built?
02Is the reporting calendar and cycle defined: who submits what, and when?
03Is the baseline acceptance process defined — what gets checked before a baseline is accepted?
04Is there a single integrated or master-programme view across the packages and contracts?
05Are change and risk capture set up from the start (registers and a clear workflow)?
06Is the schedule-assurance / quality-check process defined and applied every cycle?
07Is there a clear escalation path so exposure reaches the decision-maker in time?
Check How this tool works: inputs, method and limitations
Purpose
Catch missing foundations (standard, coding, baseline gate, reporting rhythm) while they are cheap to fix.
Intended user
Controls leads standing up a new programme or package.
Output
A band, an interpretation and the gaps to close first.
How the result is produced
Self-assessment, rule-based. Results depend on ratings or estimates you enter; they are not measured performance.
PCMS discipline
Programme and project governance · Volume 1: Governance
Learn the method
Project controls operating models (Leadership pathway)
Inputs
  • Seven yes / partly / no answers on the controls standard, reporting cycle, baseline acceptance, master programme view, change and risk capture, assurance and escalation
Method
  • Each answer scores 2, 1 or 0; the share of available points sets the band.
Limitations
  • Self-reported; a prompt, not an audit.
Suggested actions
  • Issue the controls standard before the first contractor baseline arrives.
  • Fix the coding structure before reporting starts.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
Related
Expertise: Programme Management and Governance · Reference: Programme governance standards · Case study: 16 contracts under one standard · 100-Point Framework · Not sure where to start? Decision Centre

Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →