Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Module · Reporting and governance

Executive Programme Review Generator

Turn a month’s figures and notes into a structured programme review, with facts, forecasts, risks, assumptions, judgements and actions kept apart.

Enter your own figures in any currency or unit, used consistently. The form opens with a fictional worked example so you can see how it reads. Calculations run in your browser; nothing is sent or stored. It does not connect to any scheduling or cost system.

Examples:

Programme

Schedule and progress

From the Earned Value Calculator.
From the Progress Measurement Assessment.

Cost, change, risk and assurance

From the risk register.

Narrative

One per line: name; contract or baseline date; forecast or actual date; status
One per line, e.g. “Façade output 30% below plan for three months”
One per line, most significant first; start opportunities with “Opportunity:”
One per line, e.g. “Package B – façade: two milestones missed; resources at 70% of plan”
One per line: schedule quality, report compliance, audit findings
One per line
One per line
One per line
Your view, stated as a view. One per line
One per line, phrased as a question
One per line: action; accountable owner; due date; status
One per line: what must happen in the next period
Module How this tool works: inputs, method and limitations
Purpose
Produce a consistent, decision-focused monthly review for a programme director or board.
Intended user
Controls leads and programme directors writing the monthly review.
Output
A printable review in twelve sections: executive summary, overall health, schedule and milestones, progress and productivity, cost and forecast, risk and change, contractor performance, assurance, constraints and interfaces, decisions required, actions and owners, and forward priorities.
How the result is produced
Rule-based, from figures you enter.
PCMS discipline
Reporting, dashboards and decision intelligence · Volume 3: Reporting and Performance Management
Learn the method
What senior management actually needs (Foundation pathway)
Inputs
  • Schedule, milestone, progress, cost, change, risk and assurance figures
  • Short notes: milestones, productivity, risks, contractors, assurance findings, constraints, assumptions and judgements
  • Decisions required, management actions with accountable owners, and forward priorities
Method
  • Health ratings per area by written rules (for example, schedule red when forecast completion is more than four weeks late or SPI(t) is below 0.90; the thresholds are the platform’s common definitions).
  • Overall red if two areas are red or schedule or cost is red; amber if any area is red, two are amber, or schedule or cost is amber.
  • Each statement is labelled by type, so readers can see what is measured, forecast, assumed or judged.
  • Data checks flag missing, out-of-range and inconsistent figures (for example, more milestones achieved than due, or aged change above total pending change) and actions without an owner. Nothing is corrected automatically.
  • Where information is missing the section says so and draws no conclusion; no overall rating is given with fewer than three rated areas.
Limitations
  • It structures what you enter; it does not verify it. The output is not verified project reporting.
  • Rating rules are reading aids, not a standard; adjust them to your governance.
Suggested actions
  • Lead the review with the decisions required.
  • Keep observed facts separate from forecasts and judgements.
  • Carry open actions forward until closed.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.