Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Module · Programme leadership

Programme Simulator

You are the project controls director on a 42-month, AED 5 billion infrastructure programme. Over twelve stages, from baseline approval to the Board, you choose how to respond. Each choice changes schedule, cost, risk, governance and delivery confidence, and some come back later.

Fictional scenario. Corala Bay Infrastructure Programme, its projects, contractors and figures are invented for teaching. They do not describe any real programme, client or contractor.
Projects in the fictional programme
ProjectScopeBudget (AED m)Contractor
P1Roads and bridges1,800Contractor Alpha
P2Utilities and networks1,200Contractor Beta
P3Marine works1,100Contractor Gamma
P4Public realm and buildings900Contractor Delta
Programme5,00042 months
  1. 01Baseline approval
  2. 02Schedule slippage
  3. 03Contractor underperformance
  4. 04Design delays
  5. 05Procurement constraints
  6. 06Interface failures
  7. 07Cost escalation
  8. 08Change control
  9. 09Emerging risks
  10. 10Extension of time submission
  11. 11Programme recovery
  12. 12Executive escalation
Scenario assumptions
  • Fictional programme: four packages, AED 5,000 million budget, 42 months, four contractors.
  • Every option applies effects set by the author on five measures: weeks late, cost over budget (AED m), risk exposure (0–100, lower is better), governance (0–100) and delivery confidence (0–100). Programme status starts at 0 weeks, 0 cost, risk 40, governance 60, confidence 60.
  • Some earlier decisions set conditions that change the effects of later ones, so the same choice can play out differently depending on what came before. Undo removes the last decision and its knock-on effects.
  • Outcomes are illustrative teaching consequences, not predictions or statistical estimates. Real programmes depend on the contract, the people and the records.
Module How this tool works: inputs, method and limitations
Purpose
Practise the judgement calls of programme controls leadership and see how they play out across schedule, cost, risk, governance and delivery confidence.
Intended user
Controls managers stepping up to director level, programme managers, and teams using it as a workshop exercise.
Output
A running dashboard, the outcome of each decision, a trajectory chart, strengths and weaknesses with the stronger response, a decision log and a printable assessment.
How the result is produced
Scenario model with author-set effects. Results depend on ratings or estimates you enter; they are not measured performance.
PCMS discipline
Programme and project governance · Volume 1: Governance
Learn the method
Project controls operating models (Leadership pathway)
Inputs
  • One of three responses at each of twelve stages, from baseline approval to Board escalation
Method
  • Each response applies stated effects to five measures; risk, governance and confidence are held between 0 and 100.
  • Some earlier responses set conditions that change later effects, for example a weak baseline makes later slippage harder to see.
  • Decision score: 2 for the strongest response, 1 for a mixed one, 0 for a weak one. Ratings on each measure use stated thresholds.
Limitations
  • Fictional scenario; effects are set by the author to illustrate typical consequences, not predicted from data.
  • Real decisions have more options and more context than three choices can show.
Suggested actions
  • Run it as a team and discuss the choices where people disagreed.
  • Compare the lessons with your own programme’s current decisions.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
Related
Expertise: Programme Management and Governance · Reference: Programme governance standards · Case study: 16 contracts under one standard · 100-Point Framework · Not sure where to start? Decision Centre

Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →