Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Knowledge Academy

Professional Reference Centre

What the recognised publications behind project controls actually say, why they matter, how to apply them on a major programme, and where they stop. Each guide is written in my own words and links to the official publisher; none reproduces the publication.

Editions checked on 02-Nov-26. Standards change: always confirm the current edition with the publisher before relying on it.

Society of Construction Law

SCL Delay and Disruption Protocol (2nd Ed.): Reference Guide

Practical guidance on extensions of time and compensation for delay and disruption: the records and programme a project should keep, how delay should be assessed during the project and afterwards, float, concurrency, mitigation, and how to show disruption.

2nd edition, February 2017
DCMA, US GAO, PMI

Schedule assessment frameworks: DCMA, GAO, PMI and the 100-point framework

Three published ways of judging a schedule. DCMA’s 14 metrics measure symptoms against thresholds. GAO’s ten best practices describe what a reliable schedule does, grouped into four characteristics: comprehensive, well constructed, credible and controlled. PMI’s practice standard assesses whether a schedule model has the components it should and uses them properly.

October 2012 · December 2015 · 3rd edition, 2019
US Government Accountability Office

The GAO schedule and cost guides

How auditors judge whether a programme’s schedule and cost estimate can be relied on. The schedule guide sets out ten best practices; the cost guide sets out an estimating process and four characteristics of a reliable estimate: comprehensive, well documented, accurate and credible.

December 2015; no later edition · March 2020
AACE International

AACE forensic schedule analysis (RP 29R-03)

A shared vocabulary and technical protocols for analysing delay with critical path schedules after the event. 29R-03 classifies methods by whether they observe the schedules as they were or model events into them, whether they are static or dynamic, additive or subtractive, and whether they use one baseline or many. It then sets out nine method implementation protocols (MIP 3.1 to 3.9).

Revision of 25-Apr-11 · 2006
AACE International

AACE planning and scheduling practices

A family of practices that together describe a controlled schedule: how to build logic, what level of detail suits each audience, how to document the basis of a schedule, how to identify the critical path, and how to review a baseline, review an update and manage change to the schedule.

2004 · 2010 · 2009 · 2010 · 2008 · Revision of 23-Oct-14 · Revision of 20-Jan-21
SAE / ECIA, ISO, AACE International

Earned value management: EIA-748-E and ISO 21508

How scope, schedule and cost are integrated so that performance can be measured objectively: work broken into controlled elements, budgets planned over time, progress earned by objective rules, and variances analysed and acted on.

Revision of 17-Feb-26 · 2nd edition, 06-Feb-26 · 04-May-17
ISO, AACE International

Risk and change: ISO 31000 and AACE practices

Managing uncertainty and change as part of everyday controls: a risk process built into governance, schedule contingency that is planned and owned, and changes to the schedule that are assessed, approved and recorded.

2018; a revision reached draft international standard stage on 26-Oct-26 · Revision of 16-Oct-13 reviewed; a later entry is listed by AACE · Revision of 20-Jan-21
PMI, ISO, AXELOS / PeopleCert, HM Treasury

Programme governance: PMI, ISO 21503 and MSP

How a group of related projects is governed to deliver outcomes and benefits: strategic alignment, decision rights, benefits, stakeholder engagement, the programme life cycle, and assurance.

5th edition, March 2024 · 2016 · 2nd edition, February 2022 · 5th edition, October 2020 · Updated 30-Jun-26

In preparation

  • FIDIC contract administration
  • Digital project controls

These guides explain principles for learning. They are not legal advice, they do not replace the publications, and they do not imply endorsement by any of the organisations named.