Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

ISO, AACE International

Risk and change: ISO 31000 and AACE practices

ISO 31000:2018 Risk management, Guidelines2018; a revision reached draft international standard stage on 26-Oct-26 · International standard · PurchaseOfficial source →
AACE RP 70R-12 Principles of Schedule Contingency Management, as applied in EPCRevision of 16-Oct-13 reviewed; a later entry is listed by AACE · Recommended practice · AACE members; purchase for othersOfficial source →
AACE RP 109R-19 Schedule Change Management, as applied in constructionRevision of 20-Jan-21 · Recommended practice · AACE members; purchase for othersOfficial source →
Edition checked 02-Nov-26.

01What it covers

Managing uncertainty and change as part of everyday controls: a risk process built into governance, schedule contingency that is planned and owned, and changes to the schedule that are assessed, approved and recorded.

02Why it matters

A risk register that never changes a forecast, contingency spent without a basis, and change absorbed informally are three of the most common reasons programmes surprise their boards.

03Key principles

  • Risk management is part of governance and decision-making, not a separate register.
  • Risks are identified, analysed and treated by named owners, and reviewed regularly.
  • Schedule contingency is quantified, held at a defined level and drawn down by rule.
  • Every change to the schedule is assessed for its effect, approved at the right level and recorded.

04Practical application

  • Link the top risks to the activities and cost they affect, and restate the forecast with them.
  • Hold schedule contingency visibly and record each drawdown with its reason.
  • Run one change route for scope, time and cost, with approval thresholds.

05Common mistakes

  • Hiding contingency inside activity durations.
  • Treating the risk register as a compliance document.
  • Instructing change before its time effect is assessed.
Guidance, contract and law. ISO 31000 is non-certifiable guidance. The tools on this site are deterministic; they do not perform probabilistic simulation or give statistical confidence levels.

06PCMS discipline

07Related tools

08Further reading

Written in my own words to explain principles; it does not reproduce the publication and implies no endorsement by ISO, AACE International. Not legal advice.