Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Calculator · Risk management

Risk Exposure Calculator

Three-point cost and time ranges turned into expected exposure, tested against contingency.

Enter your own figures in any currency or unit, used consistently. The form opens with a fictional worked example so you can see how it reads. Calculations run in your browser; nothing is sent or stored. It does not connect to any scheduling or cost system.

Risks

Contingency

Optional.
Optional.
Calculator How this tool works: inputs, method and limitations
Purpose
Check whether contingency covers the expected exposure from a set of quantified risks.
Intended user
Risk managers, cost managers and project directors setting or testing contingency.
Output
Expected cost and time exposure by risk and in total, the “if all happen” maximum, the share of the largest risk, and where contingency sits.
How the result is produced
Calculated from estimated ranges. Results depend on ratings or estimates you enter; they are not measured performance.
PCMS discipline
Risk and opportunity management · Volume 3: Reporting and Performance Management
Learn the method
Reading a schedule risk analysis (Advanced pathway)
Worked example
The tool opens with a fictional worked example; “Load example” restores it and “Clear” resets every input. Results can be downloaded as CSV or printed.
Inputs
  • Each risk: probability (%), minimum, most likely and maximum cost, and the same for time (days)
  • Cost and time contingency (optional)
Method
  • Mean impact = (minimum + 4 × most likely + maximum) ÷ 6 (the PERT weighting).
  • Expected exposure = probability × mean impact; totals summed across risks.
  • Contingency compared with total expected exposure and with the sum of maximums.
Limitations
  • Expected value, not a simulation: no confidence levels such as P80.
  • Time exposures are summed, which overstates when risks sit on parallel paths.
  • Assumes risks are independent.
Suggested actions
  • If contingency is below expected exposure, record who carries the gap.
  • Where one risk dominates, manage it directly rather than through contingency.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
Related
Expertise: Project Controls · Reference: Risk and change standards · Case study: Hudayriyat West programme · 100-Point Framework · Not sure where to start? Decision Centre

Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →