Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Methodology

The Project Controls Management System

An integrated framework for programme governance and delivery assurance.

A project controls management system sets out how governance, planning, cost, risk, change, reporting and assurance work as one system rather than as separate departments. I developed one in practice as a seven-volume system on a large master-development programme, and it is the reference architecture for every tool, lesson and dashboard on this platform. This page shows the seven volumes, the fifteen disciplines they cover, who is accountable, and how data stays trustworthy, in employer-neutral terms.

What is published and what is not. Only public-safe volume titles, methodology summaries, discipline descriptions and transferable operating principles are published. Controlled procedures, internal document codes, original registers, templates, project data and employer-specific configurations remain confidential and belong to the organisations concerned.

The seven volumes

Governance on top, assurance around it, delivery in between.

Volume 1 sets the rules. Volumes 2, 3 and 6 run the work: planning and progress, performance and reporting, and what contractors must deliver. Volumes 4 and 5 are the shared toolkit and the data layer. Volume 7 tests that all of it holds. Contractor performance surveillance runs across Volumes 3, 6 and 7 as an assurance regime, not a separate volume.

Volumes against disciplines

● primary home of the discipline · ○ supporting. Every discipline has one primary volume except where Volume 4 supplies its registers and forms.

Seven PCMS volumes mapped to fifteen project controls disciplines; filled circle primary, open circle supporting
DisciplineLayerV1V2V3V4V5V6V7
Programme and project governanceGovern primarysupporting
Planning and schedulingPlan & measure primarysupporting
Baseline management and controlPlan & measure supportingprimarysupporting
Progress measurement and performance managementPlan & measure primarysupportingsupporting
Earned Value Management and Earned SchedulePlan & measure supportingprimarysupporting
Interface managementPlan & measure primarysupportingsupporting
Productivity and performance measurementPlan & measure primarysupporting
Cost management, forecasting and EACForecast & respond supportingprimary
Risk and opportunity managementForecast & respond supportingprimarysupporting
Change and configuration managementForecast & respond primarysupportingsupporting
Claims, delay analysis and EOT managementForecast & respond supportingprimarysupporting
Reporting, dashboards and decision intelligenceForecast & respond supportingprimarysupporting
Schedule and project controls assuranceAssure & improve supportingsupportingsupportingprimary
Contractor performance monitoring and surveillanceAssure & improve supportingsupportingprimarysupporting
Data governance, auditability and continuous improvementAssure & improve supportingprimarysupporting

V1 GovernanceV2 Planning, Scheduling and Progress ManagementV3 Reporting and Performance ManagementV4 Templates, Registers and FormsV5 Digital Project Controls and Business IntelligenceV6 Contractor and Consultant ImplementationV7 Audit and Compliance

Volume 1 · Govern

Governance

Decision rights, delegated authority, escalation thresholds and the controls standard every other volume works under.

Contribution to governance and delivery assurance: Makes sure controls evidence reaches the person with authority to act, in time, by rule rather than by personality.

Volume 2 · Plan & measure

Planning, Scheduling and Progress Management

How programmes are built, accepted, updated and measured: logic, baselines, progress rules, interfaces, productivity and delay events.

Contribution to governance and delivery assurance: Gives the programme a dependable time model and an honest measure of progress against it.

Volume 3 · Forecast & respond

Reporting and Performance Management

Earned value and earned schedule, cost forecasting, risk exposure and the weekly, monthly and board reporting rhythm.

Contribution to governance and delivery assurance: Turns measured performance into forecasts and decisions at the right level and frequency.

Volume 4 · Enabling

Templates, Registers and Forms

The standard templates, registers and forms the other volumes use, so every package records the same things the same way.

Contribution to governance and delivery assurance: Consistency: one register format for risk, change, interfaces and delay events across every contract.

Volume 5 · Assure & improve

Digital Project Controls and Business Intelligence

Source-system authority, data quality, reconciliation, automation of checks and the reporting layer.

Contribution to governance and delivery assurance: One trusted source for each number, and analysis that runs on governed data with an audit trail.

Volume 6 · Plan & measure

Contractor and Consultant Implementation

What contractors and consultants must submit, how, and when: programme standards, reporting obligations and interface duties.

Contribution to governance and delivery assurance: Many contracts reporting the same way, so the programme rolls up into one picture.

Volume 7 · Assure & improve

Audit and Compliance

Testing that programmes, data and processes meet the standard every cycle, and closing findings.

Contribution to governance and delivery assurance: Proof that the numbers can be trusted before decisions are taken on them.

Cross-cutting assurance regime

Contractor performance surveillance

A cross-cutting assurance regime, not an eighth volume. It draws on Volume 3 (performance measures), Volume 6 (contractor obligations) and Volume 7 (audit): verified progress, commitments tracked, entry and exit triggers for enhanced surveillance, and targeted schedule audits when a trigger fires.

Full crosswalk: volumes, disciplines, roles, inputs, outputs, measures and assurance

One row per discipline. Roles are the typical accountable role in an employer-side controls team; adapt them to your organisation.

DisciplineLayerVolumeAccountable roleKey inputsOutputsPerformance measuresAssurance activityTool
Programme and project governanceGovernV1Programme directorEmployer objectives and delegated authorities; Contract structure and packaging; Approval thresholdsDecision and escalation map; Delegation of authority for controls decisions; Meeting and approval rhythmDecisions taken within the agreed cycle; Escalations resolved at the right levelEvery controls decision has a named owner and an evidence requirement; Escalation thresholds are written down and usedSetup Check
Planning and schedulingPlan & measureV2Planning leadScope and work breakdown; Construction method and sequence; Calendars, resources and constraintsIntegrated master programme; Contractor and package programmes; Programme narrativesLogic completeness; Constraint usage; Critical path continuityOpen ends, hard constraints and long lags reviewed every update; Critical path traced from completionSchedule Health Check
Baseline management and controlPlan & measureV2Planning leadSubmitted programme and budget; Acceptance criteria; Approved changeAccepted baseline with recorded conditions; Baseline revision log; Re-baseline decisionsBaseline acceptance cycle time; Unexplained baseline changesAcceptance separated from quality: the baseline is reviewed, not only approved; Every revision traceable to approved change5-Minute Baseline Check
Progress measurement and performance managementPlan & measureV2Planning leadRules of credit and milestone weights; Site records and quantities; Inspection and test recordsMeasured progress by package; Planned versus actual curves; Verified progress statementsGap between reported and verified progress; Share of progress supported by recordsSample-verify reported progress every cycle; Rules of credit applied consistently across contractorsProgress Measurement Assessment
Earned Value Management and Earned SchedulePlan & measureV3Controls managerBudgeted baseline (planned value); Measured progress (earned value); Actual costCPI, SPI and SPI(t); Variances by package; Performance trendsCPI; SPI(t); Schedule variance in timePV, EV and AC drawn from the same structure and cut-off; Indices broken down before they are acted onEarned Value Calculator
Interface managementPlan & measureV2Interface managerPackage boundaries; Access, approval and third-party dates; Design and procurement schedulesInterface register with dates and owners; Interface milestones in the master programmeInterfaces overdue; Interfaces without a programme dateEach interface has a giving and a receiving party and a date in both programmesInterface Management Tracker
Productivity and performance measurementPlan & measureV2Planning leadQuantities installed; Labour and plant deployed; Planned ratesAchieved rates by trade; Productivity trends; Evidence for recovery assumptionsAchieved versus planned output rateRecovery assumptions compared with rates actually achievedRecovery review pathway
Cost management, forecasting and EACForecast & respondV3Cost leadBudget and commitments; Actual cost; Approved and pending change; Performance indicesEstimate at completion with its basis; Variance at completion; Cost forecast trendEAC movement month to month; TCPI against CPI achievedForecast tested against formula estimates; Pending change and risk shown separately from the base forecastCost Forecast Calculator
Risk and opportunity managementForecast & respondV3Risk managerRisk workshops and registers; Programme and cost structure; Emerging issues from reportingOwned risk register with responses; Risk exposure in the forecast; Early-warning listResponses overdue; Risks that became issues without warningEach significant risk linked to the programme activities it affects; Responses tracked to completionRisk and Early Warning
Change and configuration managementForecast & respondV1Controls managerChange requests and instructions; Impact assessments; Approval decisionsChange register and pipeline; Approved baseline revisions; Configuration recordChange pipeline value and age; Approved versus pending changeEvery approved change reflected in programme and budget; Pending change visible to decision-makersChange Impact Assessment
Claims, delay analysis and EOT managementForecast & respondV2Delay and claims leadNotices and delay events; Updated programmes; Contemporaneous recordsDelay event register; Time impact assessments; Determinations and their basisDelay events assessed within the cycle; Notices on timeCause, effect and evidence established for each event; Method chosen to suit the records availableForensic Delay Lab
Reporting, dashboards and decision intelligenceForecast & respondV3Controls managerVerified performance data; Forecasts and exposure; Decisions pendingWeekly, monthly and board reports; Executive dashboard; Decision logReports on time; Decisions requested versus takenEvery report states the decision required; Data in reports reconciled to sourceExecutive Review Generator
Schedule and project controls assuranceAssure & improveV7Assurance leadProgramme submissions; Assurance criteria; Previous findingsAssurance scores and findings; Corrective actions; Trend of quality over timeAssurance score trend; Findings closed on timeSame criteria applied to every contractor, every cycleSchedule Health Check
Contractor performance monitoring and surveillanceAssure & improveV6Package managersContractual reporting obligations; Submissions and their quality; Site surveillanceContractor performance view; Surveillance findings; Escalation where neededSubmissions on time and accepted first time; Findings repeated across cyclesFindings evidenced and shared with the contractor before escalationContractor Performance Scorecard
Data governance, auditability and continuous improvementAssure & improveV5Data and BI leadSource systems and owners; Reconciliation rules; Lessons learnedData ownership map; Reconciliation and audit trail; Improvement actionsReconciliation breaks; Improvement actions closedEach reported figure traceable to its source system and cut-off; Baseline lineage recordedCritical Path Stability Monitor

Professional reference mapping

How each volume relates to recognised publications. The PCMS is an original methodology; these references inform it and are not reproduced in it. Editions checked November 2026.

VolumeAACESCL, GAO and DCMAPMIISO and other
V1 GovernanceTCM Framework (project control process)SCL Protocol (records, notices)Standard for Program Management (2024); Governance Practice Guide (2016)ISO 21502:2020; ISO 21503:2022; FIDIC Golden Principles (2019)
V2 Planning, Scheduling and Progress Management24R-03, 37R-06, 38R-06, 49R-06, 53R-06, 78R-13, 109R-19, 29R-03, 52R-06SCL Protocol; GAO-16-89G; DCMA 14-point (2012)Practice Standard for Scheduling (2019)CIOB Dynamic Time Modelling guide (2nd ed.)
V3 Reporting and Performance Management70R-12, 82R-13GAO-20-195G; GAO-16-89GPMBOK Guide 8th ed. (2025); Benefits Realization Management (2019)EIA-748-E (2026); ISO 21508:2026; ISO 31000:2018
V4 Templates, Registers and FormsTCM Framework——Original templates; controlled versions not published
V5 Digital Project Controls and Business Intelligence—GAO data reliability principlesPMBOK Guide 8th ed.ISO 9001:2026 (information and knowledge)
V6 Contractor and Consultant Implementation45R-08SCL Protocol (programme duties)Standard for Program Management (collaboration)FIDIC 2017 suite (2022 reprint), form-specific
V7 Audit and Compliance78R-13, 53R-06DCMA 14-point; GAO four characteristicsPractice Standard for Scheduling (conformance)ISO 19011:2026

Professional Reference Centre → · Programme management and the PCMS → · Employer-side implementation checklists →

Architecture

Fifteen disciplines, four layers, one system.

Choose a discipline to see its purpose, inputs, outputs, the disciplines it depends on, its measures and its assurance checks.

GovernWho decides, on what evidence, under which rules.
Plan & measureThe reference points and the honest measurement of progress against them.
Forecast & respondWhere the programme is heading, and what is being done about it.
Assure & improveProof that the numbers can be trusted, and a system that learns.

Govern

Programme and project governance

Set who decides what, at which level, on what evidence, and how exposure is escalated.

Inputs

  • Employer objectives and delegated authorities
  • Contract structure and packaging
  • Approval thresholds

Outputs

  • Decision and escalation map
  • Delegation of authority for controls decisions
  • Meeting and approval rhythm

Measures

  • Decisions taken within the agreed cycle
  • Escalations resolved at the right level

Assurance checks

  • Every controls decision has a named owner and an evidence requirement
  • Escalation thresholds are written down and used

Plan & measure

Planning and scheduling

Produce programmes that model how the work will really be built, at the right level for each audience.

Inputs

  • Scope and work breakdown
  • Construction method and sequence
  • Calendars, resources and constraints

Outputs

  • Integrated master programme
  • Contractor and package programmes
  • Programme narratives

Measures

  • Logic completeness
  • Constraint usage
  • Critical path continuity

Assurance checks

  • Open ends, hard constraints and long lags reviewed every update
  • Critical path traced from completion

Plan & measure

Baseline management and control

Agree a dependable reference for time and cost, and keep it honest as change is approved.

Inputs

  • Submitted programme and budget
  • Acceptance criteria
  • Approved change

Outputs

  • Accepted baseline with recorded conditions
  • Baseline revision log
  • Re-baseline decisions

Measures

  • Baseline acceptance cycle time
  • Unexplained baseline changes

Assurance checks

  • Acceptance separated from quality: the baseline is reviewed, not only approved
  • Every revision traceable to approved change

Plan & measure

Progress measurement and performance management

Measure progress by agreed rules so that reported and real progress match.

Inputs

  • Rules of credit and milestone weights
  • Site records and quantities
  • Inspection and test records

Outputs

  • Measured progress by package
  • Planned versus actual curves
  • Verified progress statements

Measures

  • Gap between reported and verified progress
  • Share of progress supported by records

Assurance checks

  • Sample-verify reported progress every cycle
  • Rules of credit applied consistently across contractors

Plan & measure

Earned Value Management and Earned Schedule

Join scope, time and cost into one performance measure, with schedule slippage expressed in time.

Inputs

  • Budgeted baseline (planned value)
  • Measured progress (earned value)
  • Actual cost

Outputs

  • CPI, SPI and SPI(t)
  • Variances by package
  • Performance trends

Measures

  • CPI
  • SPI(t)
  • Schedule variance in time

Assurance checks

  • PV, EV and AC drawn from the same structure and cut-off
  • Indices broken down before they are acted on

Forecast & respond

Cost management, forecasting and EAC

Forecast the outturn cost from evidence, not from the budget.

Inputs

  • Budget and commitments
  • Actual cost
  • Approved and pending change
  • Performance indices

Outputs

  • Estimate at completion with its basis
  • Variance at completion
  • Cost forecast trend

Measures

  • EAC movement month to month
  • TCPI against CPI achieved

Assurance checks

  • Forecast tested against formula estimates
  • Pending change and risk shown separately from the base forecast

Forecast & respond

Risk and opportunity management

Identify, own and act on the uncertainty that could move time and cost.

Inputs

  • Risk workshops and registers
  • Programme and cost structure
  • Emerging issues from reporting

Outputs

  • Owned risk register with responses
  • Risk exposure in the forecast
  • Early-warning list

Measures

  • Responses overdue
  • Risks that became issues without warning

Assurance checks

  • Each significant risk linked to the programme activities it affects
  • Responses tracked to completion

Forecast & respond

Change and configuration management

Control how scope, time and cost change, and keep the baseline and records consistent with it.

Inputs

  • Change requests and instructions
  • Impact assessments
  • Approval decisions

Outputs

  • Change register and pipeline
  • Approved baseline revisions
  • Configuration record

Measures

  • Change pipeline value and age
  • Approved versus pending change

Assurance checks

  • Every approved change reflected in programme and budget
  • Pending change visible to decision-makers

Plan & measure

Interface management

Make the hand-offs between packages, designers and authorities visible and owned.

Inputs

  • Package boundaries
  • Access, approval and third-party dates
  • Design and procurement schedules

Outputs

  • Interface register with dates and owners
  • Interface milestones in the master programme

Measures

  • Interfaces overdue
  • Interfaces without a programme date

Assurance checks

  • Each interface has a giving and a receiving party and a date in both programmes

Plan & measure

Productivity and performance measurement

Compare planned and achieved output rates, so forecasts and recoveries rest on demonstrated performance.

Inputs

  • Quantities installed
  • Labour and plant deployed
  • Planned rates

Outputs

  • Achieved rates by trade
  • Productivity trends
  • Evidence for recovery assumptions

Measures

  • Achieved versus planned output rate

Assurance checks

  • Recovery assumptions compared with rates actually achieved

Forecast & respond

Claims, delay analysis and EOT management

Assess delay contemporaneously, keep the records that decide entitlement, and resolve time claims on evidence.

Inputs

  • Notices and delay events
  • Updated programmes
  • Contemporaneous records

Outputs

  • Delay event register
  • Time impact assessments
  • Determinations and their basis

Measures

  • Delay events assessed within the cycle
  • Notices on time

Assurance checks

  • Cause, effect and evidence established for each event
  • Method chosen to suit the records available

Forecast & respond

Reporting, dashboards and decision intelligence

Turn controls data into the decision leadership needs to take, at the right time.

Inputs

  • Verified performance data
  • Forecasts and exposure
  • Decisions pending

Outputs

  • Weekly, monthly and board reports
  • Executive dashboard
  • Decision log

Measures

  • Reports on time
  • Decisions requested versus taken

Assurance checks

  • Every report states the decision required
  • Data in reports reconciled to source

Assure & improve

Schedule and project controls assurance

Test, every cycle, that programmes and controls data can be relied on for decisions.

Inputs

  • Programme submissions
  • Assurance criteria
  • Previous findings

Outputs

  • Assurance scores and findings
  • Corrective actions
  • Trend of quality over time

Measures

  • Assurance score trend
  • Findings closed on time

Assurance checks

  • Same criteria applied to every contractor, every cycle

Assure & improve

Contractor performance monitoring and surveillance

Watch contractor reporting and delivery against agreed obligations, fairly and consistently.

Inputs

  • Contractual reporting obligations
  • Submissions and their quality
  • Site surveillance

Outputs

  • Contractor performance view
  • Surveillance findings
  • Escalation where needed

Measures

  • Submissions on time and accepted first time
  • Findings repeated across cycles

Assurance checks

  • Findings evidenced and shared with the contractor before escalation

Assure & improve

Data governance, auditability and continuous improvement

Keep one authoritative source for each kind of data, with a trail from report back to record.

Inputs

  • Source systems and owners
  • Reconciliation rules
  • Lessons learned

Outputs

  • Data ownership map
  • Reconciliation and audit trail
  • Improvement actions

Measures

  • Reconciliation breaks
  • Improvement actions closed

Assurance checks

  • Each reported figure traceable to its source system and cut-off
  • Baseline lineage recorded

Governance and accountability

Direction flows down; evidence flows up; lessons close the loop.

  1. Employer governanceStrategic objectives, funding and the authorities delegated to the programme.
  2. Programme governanceDelegated authority, programme-level decisions and escalation.
  3. Project controls leadershipThe controls standard, integrated forecast and assurance across the programme.
  4. Discipline controls functionsPlanning, cost, risk, change and reporting, each with clear ownership.
  5. Contractors and consultantsReporting obligations set in the contract and applied consistently.
  6. Integrated forecastingOne reconciled view of time, cost and exposure.
  7. Executive reporting and decisionsThe decision required, the evidence and the options.
  8. Assurance and corrective actionIndependent testing of the data and follow-through on findings.
  9. Lessons learnedWhat the next cycle and the next programme do differently.

Lessons learned feed back into the employer’s standard for the next phase or programme.

Who does what: an example accountability matrix

R responsible · A accountable · C consulted · I informed. A generic starting point; the real allocation follows each employer’s delegation of authority and the contracts.

Example RACI for key project controls decisions
DecisionEmployerProgramme directorControls leadDiscipline leadContractor
Issue the controls standardACRCI
Accept a baseline programmeIARCC
Approve a change to time or costARCCI
Determine an extension of timeIARCC
Issue the monthly integrated forecastIARCC
Escalate an exposure above thresholdIARRI
Close an assurance findingIIARR

Delegation of authority

Every controls decision sits at a named level, with a value or time threshold above which it moves up.

Escalation

Exposure is escalated by threshold, not by mood: the forecast movement, float loss or cost variance that triggers it is written down in advance.

Evidence before decision

Each decision states the evidence it needs. A decision taken without it is recorded as such.

Integrated controls architecture

One source for every number.

The system works only if each kind of data has one authoritative source, an owner, a cut-off, and a trail from the report back to the record. Typical source systems are named as examples. This website is not connected to any of them.

Planning and scheduling system

e.g. Primavera P6

The authority for programme logic, dates and float.

Cost and commercial system

the employer’s cost platform

The authority for budget, commitments, actual cost and change values.

Document management system

e.g. Aconex or equivalent

The contractual record: notices, correspondence, submissions.

Controlled registers

risk, change, interface, delay events

Governed management records with owners and audit trails.

Reporting layer

e.g. Power BI

Presents reconciled data; it is never the source of a number.

Automation and analysis

e.g. Python scripts

Specialist checks and processing, run against source extracts.

  • Source authority: a number is corrected in its source system, never in the report.
  • Reconciliation: programme, cost and change totals are reconciled at each cut-off before reporting.
  • Baseline lineage: every baseline revision is traceable to the approved change behind it.
  • Audit trail: who changed what, when and why is recorded for every governed register.
  • Data quality: completeness and consistency checks run before analysis, not after a report is questioned.