Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Calculator · Governance

Management Action Prioritisation

Rank open management actions by impact, urgency, effort and how overdue they are.

Enter your own figures in any currency or unit, used consistently. The form opens with a fictional worked example so you can see how it reads. Calculations run in your browser; nothing is sent or stored. It does not connect to any scheduling or cost system.

Actions: impact, urgency and effort from 1 (low) to 5 (high)

Calculator How this tool works: inputs, method and limitations
Purpose
Decide which actions need attention this week, which can be planned, delegated or deferred.
Intended user
Programme directors and controls leads running an action log.
Output
A ranked list with category, counts by category, and actions with no owner or overdue.
How the result is produced
Calculated from judgement-based ratings. Results depend on ratings or estimates you enter; they are not measured performance.
PCMS discipline
Programme and project governance · Volume 1: Governance
Learn the method
Project controls operating models (Leadership pathway)
Worked example
The tool opens with a fictional worked example; “Load example” restores it and “Clear” resets every input. Results can be downloaded as CSV or printed.
Inputs
  • Each action: owner, impact, urgency and effort (1–5), days overdue
Method
  • Priority = impact × urgency + one point per full week overdue (up to five).
  • Category: act now (impact and urgency 4+), quick win (impact 3+, effort 2 or less), plan (impact 3+), delegate (urgency 3+), otherwise defer.
Limitations
  • Ratings are judgements; agree what each level means.
  • A ranking aid, not a substitute for discussion.
Suggested actions
  • Give every action an owner and a date.
  • Review “act now” items at the next management meeting.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
Related
Expertise: Programme Management and Governance · Reference: Programme governance standards · Case study: 16 contracts under one standard · 100-Point Framework · Not sure where to start? Decision Centre

Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →