Project Controls Intelligence
Experience, turned into method, tools and learning you can use on a live programme.
Everything here is free and runs in your browser. Tools use your own figures or clearly labelled fictional examples; nothing is sent or stored, and nothing connects to any scheduling or cost system.
Methodology
How an integrated controls function is designed and run.
Intelligence
Calculators, checks and guided decisions.
Leadership
Assurance, reporting and capability.
Programme intelligence, illustrated
Illustrative · fictional programme and dataA dashboard should end in a decision, not a colour.
Programme Meridian, a fictional demonstration programme, month 12. Every figure is calculated by the platform’s own tools from one data set, with ratings from the common definitions.
2 red, 4 amber of 6 areas.
Open the dashboard → Schedule+7 wksForecast 18-Nov-28; SPI(t) 0.92.
Drill down →Progress43.8%Verified, against 47.6% reported.
Drill down →Cost and forecast+4.1%EAC 4,997 (AED m); CPI 0.94.
Drill down →Risk and change130Residual exposure (AED m); 11 changes over 60 days.
Drill down →Assurance73%Schedule quality; 1 interface overdue.
Drill down →Decisions32 actions to act on now; 1 without an owner.
Drill down →Decisions requiring escalation this month
- Accept the façade recovery programme, or require resourced logic first?Recovery relies on output 30% above the best month achieved on package B. Recommendation: Note it, request resourced logic, keep the 7-week forecast until evidenced.How to test it →
- Release contingency for the five largest aged change items?11 items older than 60 days sit outside the forecast. Recommendation: Decide the five largest before the Board report; show the rest as exposure.How to test it →
- Escalate the fire authority inspection to programme director level?Critical interface IF-01 is overdue and holds zone A access. Recommendation: Escalate this week.How to test it →
Tools
Calculators, checks and guided reviews.
Every tool states its purpose, inputs, method, limitations and suggested actions underneath it. Calculations are tested against hand-worked cases.
Modules
Programme Simulator
A fictional AED 5 billion programme run as twelve management decisions, with consequences and a final assessment.
Programme and project governanceForensic Delay Lab
A prospective Time Impact Analysis and a retrospective windows analysis on a fictional programme, with a working critical path engine.
Claims, delay analysis and EOT managementRisk and Early Warning
Early-warning indicators and a working risk register: heat maps, exposure, mitigation effect, escalation and trend.
Risk and opportunity managementExecutive Programme Review Generator
Turn a month’s figures and notes into a structured programme review, with facts, forecasts, risks, assumptions, judgements and actions kept apart.
Reporting, dashboards and decision intelligenceSchedule Assurance Challenge
Find the defects seeded in a fictional schedule update, then see how DCMA’s 14 metrics, the 100-point framework’s published checks and PMI’s conformance approach each view them.
Schedule and controls assuranceBenefits Realisation Planner
A benefits register with owners, baselines, targets, dependencies and realisation dates, and a tracking view that compares progress achieved with progress expected.
Programme governance and benefitsProgramme Health and Delivery Confidence
Ten areas of programme health, from strategic alignment and benefits to schedule, cost and dependencies, combined into a stated-rule view of delivery confidence.
Reporting, dashboards and decision intelligenceProgramme Interdependency Mapper
Map the dependencies between component projects and external parties, see which late handovers cascade, and who must act.
Interface and interdependency managementProgramme Roadmap Generator
Phases, component projects, milestones, gates, benefits and assurance reviews on one timeline, with a 90-day controls transformation template.
Programme governance and life cycleCalculators
Earned Value and Earned Schedule Calculator
Cost and schedule performance from your own figures, with schedule variance measured in time.
Cost and performance measurementCost Forecast and EAC Calculator
Four standard estimates at completion side by side, with the efficiency needed to finish within budget.
Cost and performance measurementFloat Consumption Analyser
How fast float is being used on the paths you care about, and which will reach zero first.
Planning and schedule controlChange Impact Assessment
Cost, completion delay and the approval level for a proposed change.
Change and configuration managementRisk Exposure Calculator
Three-point cost and time ranges turned into expected exposure, tested against contingency.
Risk and opportunity managementProgress Measurement Assessment
Measured progress from quantities, compared with reported progress, item by item.
Progress measurement and performance managementContractor Performance Scorecard
Weighted scores across six measures for up to several contractors, side by side.
Contractor performance monitoring and surveillanceManagement Action Prioritisation
Rank open management actions by impact, urgency, effort and how overdue they are.
Reporting and governanceCritical Path Stability Monitor
How much the critical path changes between updates, what joined and left, and how completion moved.
Planning and schedule controlInterface Management Tracker
Need and forecast dates between packages, overdue and at-risk interfaces, and what to escalate.
Interface managementProgramme Reporting Compliance Checker
Check a monthly report against twelve required contents, weighted, with timeliness.
Reporting, dashboards and decision intelligenceChecks
Programme Governance Assessment
Ten questions on whether programme governance can steer the programme, with a score, the gaps and an action for each gap.
Programme governanceProgramme Closure and Benefits Transition Check
Eight questions on whether a programme can close without leaving benefits, obligations or risks unowned.
Programme closure and benefits transitionSchedule Health Check
Thirteen questions across six categories for a quick read on whether a programme is sound.
Schedule assurance5-Minute Baseline Check
Seven questions on whether a baseline is a dependable control reference.
Planning and schedule controlEOT Triage
Seven questions on whether an EOT claim has cause, effect and evidence.
Delay and change managementRecovery Programme Check
Seven questions on whether a recovery is a plan or dates pulled left.
Planning and schedule controlExecutive Dashboard Check
Seven questions on whether a dashboard supports decisions or only reports status.
Reporting and governanceProject Controls Setup Check
Seven questions on whether controls foundations are in place before a programme scales.
Governance and standardsChecklists, one-pagers and reference material in the Toolkit →
Method
Six areas where programmes succeed or fail on their controls.
Each set out as what it is, why it matters, what to check, the warning signs, and the practical approach. They sit inside the wider Project Controls Management System and are the deep dives behind Integrity-Led Project Controls.
Baseline Integrity
Is the programme technically credible?
The baseline is the accepted, logic-linked programme every measurement is made against. Baseline integrity is whether that programme is technically sound enough to trust before its dates carry any weight.
Read the method → 02Progress Integrity
Is reported progress measurable and defensible?
Whether reported progress represents actual, evidenced project progress — not optimism, not round numbers, not a figure produced to hit a reporting date.
Read the method → 03Forecast Integrity
Does the forecast reflect what is actually happening?
Whether the forecast completion date is credible — a reflection of real progress and logic, not what the programme would prefer to show.
Read the method → 04Critical Path Stability
Is the path driving completion real and stable?
Whether the critical path driving completion is genuine and reasonably stable — or an artefact of constraints and logic that shifts every update.
Read the method → 05Risk & Change
What is likely to move completion or performance?
How risk, change and programme impact interact — and whether they are connected to the schedule and reporting, or living in a register nobody reads.
Read the method → 06Decision Intelligence
What decision should management take now?
Whether project-controls information actually supports the decision leadership has to make — or simply describes what already happened.
Read the method →