Diagnostic · Programme management
Programme Closure and Benefits Transition Check
Eight questions on whether a programme can close without leaving benefits, obligations or risks unowned. You get a readiness score, the gaps, and an action for each gap. It runs entirely in your browser — nothing is sent or stored. It is a practitioner’s prompt, not an engineering or contractual certification.
Check How this tool works: inputs, method and limitations
- Purpose
- Confirm that completion, handover, benefits ownership, residual risk and lessons are settled before the programme team disbands.
- Intended user
- Programme directors, sponsors, PMO leads and receiving operations teams.
- Output
- A closure readiness score and band, the gaps, and an action for each.
- How the result is produced
- Self-assessment, rule-based. Results depend on ratings or estimates you enter; they are not measured performance.
- PCMS discipline
- Schedule and project controls assurance · Volume 7: Audit and Compliance
- Learn the method
- 15 warning signs of a poor schedule (Advanced pathway)
- Inputs
- Yes, partly or no for eight closure questions
- Method
- Yes scores 2, partly 1, no 0; the score is the total as a percentage of the maximum.
- Strong at 75% or more, needs attention from 40%, significant gaps below 40%.
- Every answer below yes is listed with a suggested action.
- Limitations
- Self-assessed and indicative.
- Does not replace contractual completion or final account procedures.
- The example answers are fictional.
- An educational tool: not affiliated with PMI, not accredited training and not exam or certification preparation.
- Suggested actions
- Agree closure criteria with the receiving organisation early.
- Transfer benefits tracking with named owners.
- Book the post-programme review before closure.
- How to read the result
- The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.