Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Module · Programme management

Benefits Realisation Planner

A benefits register with owners, baselines, targets, dependencies and realisation dates, and a tracking view that compares progress achieved with progress expected.

Enter your own figures in any currency or unit, used consistently. The form opens with a fictional worked example so you can see how it reads. Calculations run in your browser; nothing is sent or stored. It does not connect to any scheduling or cost system.

Benefits register

Baseline, target and current use the same unit as the measure. A falling target (for example, journey time) is fine.

Module How this tool works: inputs, method and limitations
Purpose
Plan and track the outcomes a programme exists to deliver, separately from the outputs its projects hand over.
Intended user
Programme managers, sponsors, benefit owners and PMO leads.
Output
A benefits register with status, a tracking view, a summary by objective, upcoming realisation dates and ownership gaps.
How the result is produced
Calculated from figures you enter.
PCMS discipline
Programme and project governance · Volume 1: Governance
Learn the method
Project controls operating models (Leadership pathway)
Inputs
  • Programme start date and review date
  • For each benefit: objective, description, measure, owner, baseline, target, current value, realisation date, dependency, measurement frequency and owner after closure
Method
  • Achieved progress = (current − baseline) ÷ (target − baseline), so falling targets such as journey time work too.
  • Expected progress rises in a straight line from the programme start to the realisation date.
  • On track when the shortfall is 10 percentage points or less; at risk up to 25; off track beyond 25. Overdue when the date has passed before the target is met.
  • Gaps flagged: no owner, no measure, no owner after closure, target equal to baseline, missing dates.
Limitations
  • Straight-line expectation is a simplification; most benefits arrive late in a programme and follow an S-curve.
  • It tracks what you enter; it does not measure or verify benefits.
  • A self-managed planning aid, not a benefits audit.
  • An educational tool: not affiliated with PMI, not accredited training and not exam or certification preparation.
Suggested actions
  • Give every benefit a named owner who will still be there after the programme closes.
  • Agree the baseline and how it is measured before work starts.
  • Report outcomes separately from project outputs at every programme board.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
Related
Expertise: Programme Management and Governance · Reference: Programme governance standards · Case study: 16 contracts under one standard · 100-Point Framework · Not sure where to start? Decision Centre

Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →