About
Rishi Javeri
A Project Controls and Programme Governance leader who turns complex programme data into clear, defensible decisions for executive leadership.
Since 2007, I have worked in project controls on major programmes with an overall portfolio exceeding AED 44 billion in the UAE, GCC and India — spanning aviation, rail, infrastructure, sports, hospitality and large-scale urban development. My work sits at the intersection of time, performance, risk, change and programme governance — building the controls, standards and assurance frameworks that keep major programmes predictable and decision-ready.
Today I lead the integrated controls function on Modon's AED 28.1B Hudayriyat West Island Development within the EllisDon PMC, reporting to the Programme Director. My formal title there is Senior Programme Controls Manager; the director-level positioning on this site reflects the scope of that work — multi-contract governance, Employer-side assurance and claims strategy — and the Project Controls Director, Head of Project Controls and PMO leadership roles I am now pursuing. Across my career the throughline has been the same: impose a clear standard, measure against it relentlessly, and surface exposure early enough to manage — whether that means lifting schedule quality on a package programme from around 25% to over 83% through digital assurance, or the evidence-led work on the Riyadh City programme in Abu Dhabi, where a 291-day claim was assessed in detail to an approved 64-day determination.
Career
Major programmes since 2007.
Employer, role, major programme and scope — the environments where the capability was built.
Hudayriyat West Island Development (Modon) — AED 28.1B. Integrated controls, digital schedule assurance, forensic delay analysis across concurrent packages.
Riyadh City Infrastructure Programme, Abu Dhabi, UAE — AED 13.47B. 14+2 contracts, 12 senior planners; a 291-day claim assessed to an approved 64-day determination — between the Engineer and independent-specialist assessments of 66 and 60 days.
Expo 2020 Dubai. Employer-side schedule assurance protecting a fixed opening date across interfaced packages.
Dubai Metro Route 2020 (RTA) and Abu Dhabi International Airport airfield infrastructure.
Project controls engagements in India.
Hazza Bin Zayed Stadium (AED 698M) and Oman Botanical Garden (USD 117M · AED 430M) — planning, EOT and forensic claims strategy.
Planning and controls on building programmes.
Ibn Battuta Gate Hotel & Offices, Dubai — AED 925M. Baseline management and recovery programmes.