Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Method and boundaries

How I Work

I don’t start with the dashboard. I start with the evidence.

The same sequence runs through every determination I carry out — a claim, a recovery programme, a schedule review. It moves deliberately from what can be proven to the decision it supports, and it is why the results hold when they are tested.

This page explains what I can be approached about, the problems the method is built for, how a review is approached, what information it needs, and the professional boundaries that apply.

Evidence of thinking
Problem

A complex programme-control question — a claim, a recovery, a schedule review.

Method

Evidence → Baseline → Progress → Logic → Critical Path → Cause → Effect → Forecast → Decision.

Evidence

The programme and the contemporaneous record — not the narrative.

Decision

The position the evidence actually supports.

Outcome

A defensible conclusion that holds when it is tested.

What I can be approached about

Seven areas of expertise.

Executive and leadership opportunities, professional discussion, speaking, and collaboration on methodology or learning in these areas:

How a review is approached

The same nine steps, every time.

01

Evidence

↓

Start with the record — programmes, progress, correspondence, instructions. What can be shown, not what is asserted.

02

Baseline

↓

Establish the accepted, logic-linked programme everything is measured against. If the baseline is weak, everything downstream inherits the weakness.

03

Progress

↓

Test whether reported progress is real and measurable — planned versus actual, earned versus planned, the same way every cycle.

04

Logic

↓

Interrogate the network — relationships, constraints, calendars. A schedule held together by hard constraints cannot react to the truth.

05

Critical path

↓

Find the path actually driving completion, and watch how it migrates. The path the software reports is not always the one running the job.

06

Cause

↓

Tie each event to a demonstrable cause, on the driving path, at the time it bit — cause and effect shown, not assumed.

07

Effect

↓

Isolate the effect on completion — net of float, mitigation and the contractor’s own delay. Days that reach the milestone, not days that felt painful.

08

Forecast

↓

Rebuild a forecast that reflects what is actually happening — honest dates leadership can plan against.

09

Decision

Resolve it all into the decision in front of management now: intervene, accept, escalate, or hold.

Evidence → Baseline → Progress → Logic → Critical Path → Cause → Effect → Forecast → Decision

Information needed

What it takes to understand a problem.

A programme problem can rarely be judged from a summary. The method works from the record, typically:

  • The contract provisions on time, programme, notices and change, and any particular conditions
  • The accepted baseline in native Primavera P6 format, with its basis of schedule
  • Monthly updates at their data dates, not only the latest one
  • Progress records and the rules used to measure it
  • Instructions, notices, correspondence and the change register
  • The risk register and the reports the programme already produces

Please do not send confidential documents through the contact form. A short description of the question is the right starting point.

Professional boundaries

Expertise is not the same as availability.

  • I am employed as Senior Programme Controls Manager at EllisDon, in the PMC on Modon’s Hudayriyat West Island Development. My obligations to that role come first.
  • This site explains methodology. It does not offer independent consulting, schedule or claim reviews, expert witness services or other paid engagements.
  • I do not discuss confidential employer, client, contractor or project information, and I avoid any matter that could raise a conflict of interest.
  • Nothing here is legal advice. Entitlement depends on the contract, the facts and the governing law.
  • The tools on this site give indicative results for learning and self-assessment, not professional determinations.

The right routes are an executive or leadership opportunity, a professional discussion, speaking, or collaboration on methodology or learning.

Where it leads

The results are the method, applied.

This sequence is what let a 291-day claim resolve to an approved 64 days, and a 426-day position reduce to 91 — traced event by event, on the critical path, from evidence to decision. It is set out as a framework under Integrity-Led Project Controls, and demonstrated in the case studies and forensic delay analysis.