Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Diagnostic · Programme management

Programme Governance Assessment

Ten questions on whether a programme’s governance can actually steer it: strategy, structure, decision rights, accountability, escalation, reporting, assurance and benefits ownership. You get a maturity score, the gaps, and an action for each gap. It runs entirely in your browser — nothing is sent or stored. It is a practitioner’s prompt, not an engineering or contractual certification.

01Is the programme’s link to organisational strategy written down and re-tested at each gate?
02Is there a governance structure (sponsor, board, programme director, PMO) with written terms of reference?
03Are decision rights and financial delegations set in numbers, not adjectives?
04Does every major decision have an accountable owner and a recorded basis?
05Are escalation thresholds defined for time, cost, risk and benefits, and used?
06Do programme reports lead with the decisions required, and separate facts from forecasts and judgements?
07Is there independent assurance at gates and when indicators turn red?
08Does every benefit have a named owner who stays accountable after the programme closes?
09Are gate criteria written in advance and gates passed on evidence?
10Are cross-component conflicts resolved quickly, on the record?
Check How this tool works: inputs, method and limitations
Purpose
Find the governance gaps that stop a programme board from making timely, evidence-based decisions.
Intended user
Sponsors, programme directors, PMO leads and assurance reviewers.
Output
A governance maturity score and band, the gaps, and an action for each.
How the result is produced
Self-assessment, rule-based. Results depend on ratings or estimates you enter; they are not measured performance.
PCMS discipline
Programme and project governance · Volume 1: Governance
Learn the method
Project controls operating models (Leadership pathway)
Inputs
  • Yes, partly or no for ten governance questions
Method
  • Yes scores 2, partly 1, no 0; the score is the total as a percentage of the maximum.
  • Strong at 75% or more, needs attention from 40%, significant gaps below 40%.
  • Every answer below yes is listed with a suggested action.
Limitations
  • Self-assessed; the result is only as honest as the answers.
  • Indicative, not a benchmark or an audit.
  • The example answers are fictional.
  • An educational tool: not affiliated with PMI, not accredited training and not exam or certification preparation.
Suggested actions
  • Answer as a board, not alone.
  • Assign each action an owner and a date.
  • Repeat before each gate.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
Related
Expertise: Programme Management and Governance · Reference: Programme governance standards · Case study: 16 contracts under one standard · 100-Point Framework · Not sure where to start? Decision Centre

Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →