Expertise
Planning and Scheduling
Building programmes that model reality — and hold up when the pressure comes.
A programme is only as useful as it is true. Good planning in Primavera P6 is not about a tidy bar chart; it is about a network whose logic, durations and constraints genuinely represent how the work will be built — so that when something changes, the schedule tells you what it means.
How I approach it
Sound structure first: a WBS and coding that match how the work is managed, logic that responds correctly when activities move, durations traceable to a resourcing basis, and constraints kept to the few that are truly justified. Built that way, a programme becomes a decision tool rather than a reporting artefact — and a solid foundation for every downstream control, from progress measurement to delay analysis.
See the practitioner-level Primavera P6 Practical Guides — baseline vs current, critical path, float, constraints, out-of-sequence progress, recovery and forecasting.
Testing a contractor’s programme before it is relied on is a separate discipline: see Schedule Assurance and the 100-Point Employer Schedule Assurance Framework.
Discuss this capability for your programme.
Connect →Frequently asked questions
What makes a baseline programme acceptable to an employer?
Complete scope, sound logic, realistic durations, a credible critical path, sensible float, and the contract milestones and constraints modelled honestly. It should also come with a written basis of schedule so the reviewer can see the assumptions.
How is schedule quality measured?
Commonly with the DCMA 14-point metrics as diagnostic prompts, the GAO schedule best practices for a full review, and an employer acceptance standard for the accept-or-reject decision. They answer different questions and should be reported separately.
What should a monthly schedule update show?
Actual progress at the data date, revised forecasts for remaining work, logic that still reflects the work on site, and a narrative explaining movement in the critical path and completion date.
When is a recovery programme credible?
When the recovery is resourced, the logic changes are real rather than dates pulled forward, productivity assumptions are supported by achieved rates, and the risks of the recovery are stated.