Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Module · Risk and opportunity management

Risk and Early Warning

Two parts. First, twelve early-warning indicators that show whether a programme is heading for trouble before the completion date moves. Second, a working risk register: heat maps, expected exposure, what mitigation is buying, a risk-adjusted forecast and what needs escalating.

Runs in your browser. The register opens with a fictional example; your own entries are kept only in this browser. Exposure is calculated by expected value, a simple deterministic method. This is not a simulation and gives no confidence levels.

Early-warning indicators

For each, is the signal present on your programme now? Answer “not known” rather than guess; unknowns are reported as information gaps.

01Forecast completion has moved later in two or more consecutive updates.Critical
02The critical path has changed without an explanation.Critical
03Float on near-critical paths is falling each update.
04Reported progress is ahead of measured or verified progress.
05The forecast assumes productivity above rates achieved so far.
06Resources on site are below the programme’s resource plan.
07Design, approvals or long-lead items are behind their need dates.Critical
08Pending change older than 60 days is growing.
09The cost forecast is rising while reported progress is on plan.
10Contractor programme submissions are late or rejected.
11Interface dates between packages are being missed.
12Management actions are repeatedly overdue.

Risk and opportunity register

Ratings 1 (low) to 5 (high). Probability ratings stand for 10, 30, 50, 70 and 90%. Cost in any unit used consistently; time in days. Residual columns are after mitigation; leave them blank if mitigation has no effect yet.

Settings

Optional. Used for the risk-adjusted forecast.
Probability × impact, 1–25. Default 15.
Module How this tool works: inputs, method and limitations
Purpose
Spot programme trouble before it reaches the completion date, and keep a risk register that shows exposure, ownership and what mitigation is buying.
Intended user
Risk managers, controls leads and programme directors preparing a monthly risk review.
Output
An early-warning band with the indicators driving it; inherent and residual heat maps; exposure, mitigation effect and risk-adjusted forecast; escalations, ownership gaps, trend and exposure by milestone.
How the result is produced
Calculated from judgement-based ratings. Results depend on ratings or estimates you enter; they are not measured performance.
PCMS discipline
Risk and opportunity management · Volume 3: Reporting and Performance Management
Learn the method
Reading a schedule risk analysis (Advanced pathway)
Inputs
  • Answers to twelve early-warning indicators (present, partly, absent, not known)
  • Risks and opportunities: owner, probability and impact ratings 1–5, cost and time effect, linked milestone, mitigation, residual ratings and effects, trend
  • Optional base cost forecast and an escalation score threshold
Method
  • Early warning: weighted share of indicators present (partly counts half); “not known” is excluded and reported as a gap. Bands: 50% and above act now, 25% and above watch closely; a critical indicator present raises the band.
  • Score = probability rating × impact rating (1–25). Probability ratings map to mid-band probabilities of 10, 30, 50, 70 and 90%.
  • Expected exposure = mapped probability × cost (or days). Mitigation effect = 1 − residual exposure ÷ inherent exposure.
  • Risk-adjusted forecast = base forecast + residual risk exposure − opportunity exposure. Escalate risks whose residual score reaches the threshold.
Limitations
  • Expected value is a simple deterministic method, not a simulation; it does not produce confidence levels.
  • Schedule exposure is summed by milestone for visibility; delays on parallel paths do not add up in reality.
  • Ratings are judgements; their value depends on consistent definitions.
Suggested actions
  • Give every risk scoring 10 or more an owner and a mitigation.
  • Report residual, not inherent, exposure in the forecast.
  • Treat indicators marked “not known” as information requests.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
Related
Expertise: Project Controls · Reference: Risk and change standards · Case study: Hudayriyat West programme · 100-Point Framework · Not sure where to start? Decision Centre

Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →