Self-assessment tool
Schedule Health Check
Answer thirteen questions about your programme. You’ll get a category-level snapshot — where it’s strong and where to look first — with links to the relevant methodology. If you can’t confirm a point, choose “Not known” — it is reported as an information gap, not a defect. It runs entirely in your browser; nothing is sent or stored. It is a practitioner’s prompt, not an engineering or contractual certification. Its six categories follow the Project Controls Intelligence topics, so it is a lightweight check — not the 100-Point Employer Schedule Assurance Framework and not its score.
Check How this tool works: inputs, method and limitations
- Purpose
- Give a category-level snapshot of programme health and point to where to look first.
- Intended user
- Anyone receiving a programme who needs a fast first view before a detailed review.
- Output
- Overall band, a finding per category, evidence to check, risk if unresolved, next action and further reading.
- How the result is produced
- Self-assessment, rule-based. Results depend on ratings or estimates you enter; they are not measured performance.
- PCMS discipline
- Schedule and project controls assurance · Volume 7: Audit and Compliance
- Learn the method
- 15 warning signs of a poor schedule (Advanced pathway)
- Inputs
- Thirteen yes / partly / no / not known answers about the programme
- Method
- Each answer scores 2, 1 or 0; “not known” is reported as an information gap, not scored.
- Category and overall bands are set by the share of available points.
- Limitations
- Self-reported answers, not a file analysis.
- Not the 100-Point Employer Schedule Assurance Framework and not its score.
- Suggested actions
- Use the weakest category to scope the detailed review.
- Turn every “not known” into a specific information request.
- How to read the result
- The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
- Related
- Expertise: Schedule Assurance · Reference: Schedule assessment frameworks · Case study: Schedule quality 25% to 83% · 100-Point Framework · Not sure where to start? Decision Centre
Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →