Field notes from the controls function.
Written as ordered series you can read start to finish, plus standalone pieces. Each series is dated and numbered.
The SCL Protocol, in Practice
10 of 24 published · latest 20-Nov-26The Six Methods at a Glance
The Protocol sets out six recognised delay-analysis methods — and, in the 2nd Edition, deliberately stops telling you which to use for analysis done long after the event. Instead it gives you the dimensions that separate them: the direction of the analysis, how the critical path is found, and whether you're forecasting or looking back. Learn the map, and the individual methods stop being a soup of acronyms.
5 min readProspective vs Retrospective: Two Different Jobs
There are two ways to look at delay. Prospectively — forward, from a point in time: "what is this event likely to do to completion?" And retrospectively — backward, with hindsight: "what actually happened, and what caused it?" They answer different questions, they can give different answers, and neither is universally right. Which one fits depends on the stage, the purpose, the contract and the records you have.
6 min readDon't 'Wait and See': Why Timing Beats Cleverness
'We'll sort the EOT at the end' is how a good claim quietly dies. The Protocol's guidance is to assess the time impact of delay events as the work proceeds — contemporaneously — rather than wait and see, then reconstruct it all later with hindsight. Assessing as you go keeps the programme a live tool, keeps entitlement current, and produces the records that make the analysis defensible.
7 min readRecords: The Boring Thing That Wins Cases
Delay claims are rarely lost on principle. They're lost because the records that would have proved cause and effect were never kept — or were reconstructed after the dispute started, when they carry far less weight. Contemporaneous records are the single biggest thing separating a claim you can prove from a story you can only tell.
7 min readCause, Effect and Evidence: The Three-Legged Stool
A delay claim stands on three legs — cause (a delay event, and whose risk it is), effect (its impact on the critical path to completion) and evidence (records that prove both). Knock out any one and the claim falls. Most weak claims have a genuine cause and simply never prove the effect.
7 min readThe Baseline Programme: Where the Conversation Starts
The baseline is the agreed starting line against which every later delay is measured. If it isn't realistic, logic-driven and — ideally — accepted under the contract, it can't carry the weight of a delay analysis. A programme you emailed once is not automatically a baseline, and a baseline propped up by constraints is a date, not a plan.
7 min readThe Critical Path: Where Time Really Lives
The critical path is the sequence that actually determines your completion date — the longest path through the logic, carrying the least float. Delay to it delays the job; delay to anything with float doesn't, until the float runs out. And 'critical' isn't a badge the software hands out — it's the path currently driving the finish, and it can move.
7 min readExtension of Time: What Are You Actually Measuring?
An extension of time isn't a reward for a project running late. It measures one specific thing — the effect of Employer Risk Events on the critical path to a contractual completion milestone. It nets out your own delays, it doesn't automatically hand you money, and it protects the Employer too by keeping the completion date alive.
8 min readDelay vs Disruption: They're Not Twins
Delay is about time — an event pushes out the completion date, so you argue an extension of time. Disruption is about productivity — work becomes less efficient, so it costs more, whether or not the job finishes late. Different claims, different tests, different evidence. Run one as if it were the other and you can lose both.
7 min readWhat the SCL Protocol Is Actually Trying to Solve
The SCL Delay and Disruption Protocol is a shared rulebook for how to have the delay conversation well — not a verdict on how it ends. It is not law, not a contract, and it decides no one's entitlement. Used from day one, it stops most disputes before they start.
7 min readBasics of Construction Claims
7 of 8 published · latest 02-Oct-26Prospective vs Retrospective Delay Analysis
Two competent analysts, the same events, the same records, different awards — because they stood in different places to look. The choice between a prospective and a retrospective stance is one of the most consequential and least examined decisions in a delay claim.
8 min readHow a Delay Is Measured
There is no single correct way to measure delay — there is a correct way for the records, the programme quality and the timing in front of you. Choosing the method, and being able to defend the choice, is most of the analysis.
9 min readNotices & Records
The analysis everyone finds interesting comes last. By the time it arrives, the outcome is usually already fixed by two unglamorous things done — or not done — at the time: the notice served, and the record kept.
8 min readConcurrent Delay
Concurrent delay is the most contested concept in delay claims because it sits exactly where entitlement to time and entitlement to money part company. The label is applied loosely and the law is unsettled — which is precisely why it rewards precision.
8 min readWho Owns the Delay?
Once a delay to completion is established, the outcome turns entirely on risk allocation — whose risk was the delaying event under this contract, read against this governing law. Three categories carry most of the answer; the interesting cases live in the margins.
8 min readExtension of Time — Beyond the Basics
An Extension of Time is widely misunderstood as a claim for money. It is not. Understanding precisely what an EOT secures — and what it deliberately leaves unresolved — separates a position that holds from one that unravels on review.
8 min readCritical Path Analysis for Construction Claims
Almost every delay dispute turns on the critical path — and almost every weak one rests on a critical path that was never interrogated. The distinction between the schedule's critical path and the project's driving path is where claims are won and lost.
8 min readDirector's View
2-part series · 05-Aug-26 – 12-Aug-26Schedule Updating Is Not Schedule Control
Dropping progress into the programme every month is updating. Using it to change what happens next is control. Plenty of teams do the first and none of the second — and then wonder why the date keeps slipping.
4 min readWhy a Beautiful Dashboard Can Still Be Useless
A dashboard's job is to change a decision, not to look impressive. Data volume is not insight, and a beautiful chart nobody acts on is a cost, not an asset.
4 min readThis series continues as Director’s Field Notes →
Director's Field Notes
10-part series · 08-Jul-26 – 09-Sep-26What I Look For Before I Accept Reported Progress
Reported progress is a claim. Before it becomes a fact I can forecast on, it has to reconcile with the record — actual dates, physical evidence, and the sequence the work was actually built in.
4 min readWhat Negative Float Actually Tells Me
Negative float is not an entitlement and not a verdict. It is the network telling you it cannot meet a constrained date on the current logic — and the useful question is always why.
4 min readWhen I Receive an EOT Submission, I Don't Start With the Narrative
The narrative is the contractor's case, and a good one is persuasive by design. I start somewhere less persuadable — the programme, the records, and the path that was actually driving completion when the event occurred.
4 min readWhat I Check Before I Trust a Contractor's Recovery Programme
A recovery programme is a claim about the future. Before I let it change how the job is run, I test whether the mechanics behind it are real — or whether the dates were simply pulled left.
5 min readWhat I Look For When a Programme Says It Is Recovering
Reported recovery and demonstrated recovery are different things. A programme can announce that it is recovering for months while the evidence quietly says otherwise.
5 min readHow I Challenge an EOT Without Becoming Adversarial
Rigour and hostility are not the same thing. The strongest EOT assessments are the least emotional — they test the submission against transparent, evidential criteria, not against the reviewer's mood.
5 min readWhat a PMC Should Never Blindly Accept
The Employer's controls function exists to assure, not to relay. There is a short list of things I never pass upward without testing them first — because once they are accepted, they become the record.
5 min readWhat I Expect From a Project Controls Manager
The best controls managers I have worked with are not the ones with the tidiest programmes. They are the ones who own the number, challenge what does not add up, and tell me what to do about it.
5 min readWhen Automation Just Automates Bad Controls
Automation raises the floor; it does not raise the ceiling. Automate a good control and you get consistency at scale. Automate a flawed one and you get bad controls, faster and with more confidence.
5 min readWhy an Approved Baseline Can Still Be a Poor Control Baseline
Acceptance and quality are different questions. A baseline can be contractually approved and still be a poor instrument to control the job with — and knowing the difference is part of the job.
5 min readMore insights
What Does a Project Controls Director Actually Do?
The title is common; the role is widely misunderstood. A Project Controls Director exists to make a programme's numbers trustworthy — and to turn them into decisions the board can act on.
6 min read Construction Claims · 16-Aug-26FIDIC Extension of Time Claims
Under FIDIC, a strong Extension of Time claim is won as much on procedure as on merit. Miss the notice, and even a genuine delay can fall away.
6 min read Delay Analysis · 15-Aug-26AACE 29R-03 in Practice
AACE International's Recommended Practice 29R-03 is the most widely cited framework for classifying forensic schedule analysis methods. It doesn't pick a method for you — it gives a common language for choosing one you can defend.
6 min read Delay Analysis · 14-Aug-26Time Impact Analysis (TIA): A Practical Guide
Time Impact Analysis models a delay event into the programme as it stood at the time, to show its prospective effect on completion. It is the method most contracts and protocols reach for first — when the records support it.
7 min read Delay Analysis · 14-Aug-26What Is Delay Analysis in Construction?
Delay analysis is the disciplined process of establishing what actually moved a project's completion date — and who is entitled to time or money as a result. Being late is not the same as being entitled.
6 min read Delay & EOT · 12-Aug-26How to Assess an EOT Claim
Writing a strong EOT claim and assessing one fairly are different disciplines. From the reviewer's chair, the job is to test entitlement against the evidence — consistently, and defensibly — not to negotiate it.
7 min read Digital · 11-Aug-26Power BI for Project Controls
A dashboard is not intelligence. Power BI can turn controls data into decisions — or into a prettier version of the same overwhelming detail. The difference is discipline, not tooling.
6 min read Programme Governance · 11-Aug-26What Senior Management Actually Needs from Project Controls
Ask a board what they want from project controls and they rarely say 'more data' — yet that is what they usually get. The functions that earn a seat at the table do the opposite.
6 min read Primavera P6 · 10-Aug-26Common Primavera P6 Scheduling Mistakes
P6 will faithfully calculate nonsense if you feed it nonsense. The most damaging scheduling mistakes are not exotic — they are ordinary habits that quietly destroy a programme's reliability.
6 min read Programme Governance · 09-Aug-26Programme Controls vs Project Controls
The terms are used interchangeably, but the step from one to the other is real — and it is where controls stops being a reporting function and starts being a governance one.
5 min read Schedule Assurance · 08-Aug-26Why Recovery Programmes Fail
A recovery programme is a promise to leadership that lost time will be regained. Most break that promise — not because recovery was impossible, but because the plan was never actually deliverable.
6 min read Digital · 04-Aug-26Using Python to Improve Primavera P6 Schedule Assurance
Reviewing schedule quality by hand does not scale. On a large programme, no team can check thousands of activities across a dozen contractors every month and stay consistent — so the check itself has to become code.
7 min read Schedule Assurance · 28-Jul-2615 Warning Signs of a Poor Construction Schedule
A programme is a claim about the future, and like any claim it can be sound or hollow. Most poor schedules fail in the same recognisable ways.
8 min read Delay & EOT · 21-Jul-26What Makes an EOT Claim Defensible?
The gap between days claimed and days awarded is usually a gap in discipline, not entitlement. I have seen a 291-day claim resolve to 64 — because the analysis behind it was built to survive scrutiny.
7 min read Planning · 14-Jul-26Critical Path vs Longest Path
They are often treated as identical. On a constrained programme they diverge — and knowing which delays truly threaten completion depends on telling them apart.
5 min read Schedule Assurance · 07-Jul-26How to Review a Primavera P6 Baseline
The baseline you accept is the one you'll be measured against — and the one every future delay claim is argued from. Here's how to review one before you sign it off.
7 min read