Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Project controls · United Arab Emirates

Project Controls for Major UAE Programmes

Employer-side and PMC project controls that turn programme data into decisions: one standard, one data set, and assurance that the numbers can be trusted.

I am Senior Programme Controls Manager at EllisDon, in the PMC on Modon’s AED 28.1 billion Hudayriyat West Island Development in Abu Dhabi. Since 2007 I have worked on major programmes in Abu Dhabi and Dubai, with AED 44 billion+ of programme portfolio exposure (the combined value of the programmes I have worked on, not a value I managed alone).

Based in Abu Dhabi, working across the UAE and the wider GCC. The UAE’s capital programme spans transport, city-scale infrastructure, real estate and mixed-use, sports and leisure, energy and utilities, and government-led development. Its controls problems are much the same in every emirate: many packages, many contractors, tight interfaces and employers who need a reliable view of time and cost.

What integrated project controls cover

Eleven service areas, one system.

These are the eleven headline areas an employer or PMC sees. Behind them, the Project Controls Management System organises the same work into fifteen operational disciplines in four layers; the PCMS crosswalk shows each discipline’s volume, role, inputs, outputs and assurance.

How it is applied

Methodology first, then the tools that test it.

  1. Set the standard. The seven-volume Project Controls Management System defines governance, planning and progress, reporting, templates, digital controls, contractor obligations and audit. Its fifteen disciplines sit in four layers: govern, plan and measure, forecast and respond, assure and improve.
  2. Accept the baseline on evidence. Contractor programmes are tested against an employer acceptance standard, the 100-Point Employer Schedule Assurance Framework, with the DCMA 14-point metrics used separately as diagnostic prompts.
  3. Measure, forecast and respond. Earned value, verified progress, risk exposure and change are read together each period, with the Project Controls Toolkit showing each calculation openly.
  4. Report for decisions. The Programme Intelligence Dashboard shows how the measures combine for an executive, on clearly labelled fictional data.
  5. Assure and improve. Volume 7 tests that every other control holds, and contractor performance surveillance runs across Volumes 3, 6 and 7.

Frequently asked questions

What do integrated project controls cover?

Time, cost, progress, risk, change and reporting managed as one system with one data set, so a forecast date and a forecast cost come from the same assumptions. On major UAE programmes that means one controls standard applied to every package and contractor.

What is the difference between project controls and programme controls?

Project controls manage a single contract or package. Programme controls integrate many packages, contractors and interfaces into one view for the employer, and test whether the programme as a whole will deliver its milestones and outcomes.

How is the Project Controls Management System (PCMS) organised?

Seven volumes: governance; planning, scheduling and progress; reporting and performance; templates, registers and forms; digital controls and business intelligence; contractor and consultant implementation; and audit and compliance. They support fifteen controls disciplines across four operating layers. Contractor performance surveillance runs across three of the volumes as an assurance regime.

Do you work across the UAE or only in Abu Dhabi?

I am based in Abu Dhabi and my programme experience spans Abu Dhabi and Dubai, including transport, sports, hospitality, mixed-use and city-scale infrastructure. The methods on this site apply to major programmes anywhere in the UAE and the wider GCC.

Across the platform

Discuss project controls for your programme.

Discuss programme controls →Executive profile →