Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Calculator · Contractor performance

Contractor Performance Scorecard

Weighted scores across six measures for up to several contractors, side by side.

Enter your own figures in any currency or unit, used consistently. The form opens with a fictional worked example so you can see how it reads. Calculations run in your browser; nothing is sent or stored. It does not connect to any scheduling or cost system.

Weights

Scores, 1 (poor) to 5 (strong); leave blank if not assessed

Calculator How this tool works: inputs, method and limitations
Purpose
Compare contractor performance on the same measures and weights, and find the weakest area for each.
Intended user
PMC and employer teams running monthly contractor reviews.
Output
A score, band and weakest measure for each contractor, ranked.
How the result is produced
Calculated from judgement-based ratings. Results depend on ratings or estimates you enter; they are not measured performance.
PCMS discipline
Contractor performance monitoring and surveillance · Volume 6: Contractor and Consultant Implementation
Learn the method
Measuring contractor performance fairly (Management pathway)
Worked example
The tool opens with a fictional worked example; “Load example” restores it and “Clear” resets every input. Results can be downloaded as CSV or printed.
Inputs
  • Weights for six measures
  • Each contractor’s score 1–5 on each measure (blank if not assessed)
Method
  • Weighted score = Σ(weight × score) ÷ Σ(weights of scored measures).
  • Bands: 4 and above strong, 3 satisfactory, 2 needs improvement, below 2 poor.
Limitations
  • Scores are judgements; they need written criteria and evidence to be fair.
  • Measure what the contractor controls; record employer-caused effects separately.
Suggested actions
  • Share the scorecard and its evidence with each contractor before escalating.
  • Hold a focused meeting on the weakest measure, not a general warning.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
Related
Expertise: PMO Leadership · Reference: Schedule assessment frameworks · Case study: 16 contracts under one standard · 100-Point Framework · Not sure where to start? Decision Centre

Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →