Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Calculator · Change management

Change Impact Assessment

Cost, completion delay and the approval level for a proposed change.

Enter your own figures in any currency or unit, used consistently. The form opens with a fictional worked example so you can see how it reads. Calculations run in your browser; nothing is sent or stored. It does not connect to any scheduling or cost system.

The change

Optional. Loss of productivity on surrounding work.
Negative if the activity is already driving late completion.
Preliminaries, supervision, site running costs.
Optional.

Delegation of authority

Calculator How this tool works: inputs, method and limitations
Purpose
Give a quick, consistent first view of what a change does to cost and completion, and who must approve it.
Intended user
Change managers, cost engineers, planners and project managers screening a change request.
Output
Completion delay, float remaining, cost build-up, contingency after the change and the approval level with its reasons.
How the result is produced
Calculated.
PCMS discipline
Change and configuration management · Volume 1: Governance
Learn the method
Commercial and schedule integration (Management pathway)
Worked example
The tool opens with a fictional worked example; “Load example” restores it and “Clear” resets every input. Results can be downloaded as CSV or printed.
Inputs
  • Direct cost of the change
  • Time effect on the affected activity (days) and that activity’s total float
  • Time-related cost per day of completion delay
  • Optional disruption allowance (% of direct cost) and remaining contingency
  • Approval limits for project manager and programme director
Method
  • Completion delay = time effect − positive float (not below zero). Negative float means the activity already drives late completion, so all of the time effect counts.
  • Total = direct cost + disruption allowance + completion delay × time-related daily cost.
  • Approval level by total against the limits; any completion delay lifts approval to at least programme director.
Limitations
  • One activity and its float stand in for a full impacted-programme analysis.
  • Does not decide entitlement or who bears the cost.
Suggested actions
  • Run a proper fragnet in the programme for any change that reaches completion.
  • Record time and cost effects together in the change register.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
Related
Expertise: Claims and extension of time · Reference: Risk and change standards · Case study: 291 days claimed, 64 approved · 100-Point Framework · Not sure where to start? Decision Centre

Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →