Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Calculator · Progress measurement

Progress Measurement Assessment

Measured progress from quantities, compared with reported progress, item by item.

Enter your own figures in any currency or unit, used consistently. The form opens with a fictional worked example so you can see how it reads. Calculations run in your browser; nothing is sent or stored. It does not connect to any scheduling or cost system.

Items

Items whose reported and measured progress differ by more than this are flagged.
Calculator How this tool works: inputs, method and limitations
Purpose
Test reported progress against measured quantities before it goes into earned value or a forecast.
Intended user
Progress surveyors, planners and PMC reviewers.
Output
Measured against reported progress overall and by item, the gap, and the items to verify.
How the result is produced
Calculated.
PCMS discipline
Progress measurement and performance management · Volume 2: Planning, Scheduling and Progress Management
Learn the method
Progress measurement methods (Foundation pathway)
Worked example
The tool opens with a fictional worked example; “Load example” restores it and “Clear” resets every input. Results can be downloaded as CSV or printed.
Inputs
  • Each item: budget weight, quantity done, total quantity and reported %
  • Tolerance in percentage points (default 5)
Method
  • Measured % = quantity done ÷ total (capped at 100%).
  • Package progress = weighted average of item progress; weights are normalised.
  • Items whose reported and measured progress differ by more than the tolerance are flagged.
Limitations
  • Assumes quantities are the right measure; equipment and discrete items may need weighted milestones instead.
  • Only as reliable as the quantities entered.
Suggested actions
  • Verify flagged items on site before the next report.
  • Agree rules of credit where gaps keep recurring.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.