Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Diagnostic · Recovery

Recovery Programme Check

Seven quick questions on whether a recovery programme is a plan — or just dates pulled left — before you accept it as the new baseline. It runs entirely in your browser — nothing is sent or stored. It is a practitioner’s prompt, not an engineering or contractual certification.

01Has the logic been kept intact — not relaxed or overlapped just to make the date?
02Where durations are shortened, is there a method or basis behind the change?
03Are the resources the recovery assumes actually secured and achievable?
04Is the recovery date held by real logic, not a constraint dropped on completion?
05Does the recovered critical path still make engineering sense?
06Is there any float left to absorb the next problem (not all stripped out)?
07Is the assumed productivity a rate this job has actually achieved before?
Check How this tool works: inputs, method and limitations
Purpose
A two-minute screen of a recovery programme before a fuller review.
Intended user
Employer, PMC and contractor teams receiving or preparing a recovery programme.
Output
A band, an interpretation and what to test first.
How the result is produced
Self-assessment, rule-based. Results depend on ratings or estimates you enter; they are not measured performance.
PCMS discipline
Productivity and performance measurement · Volume 2: Planning, Scheduling and Progress Management
Learn the method
What I check before I trust a recovery programme (Management pathway)
Inputs
  • Seven yes / partly / no answers on logic, shortened durations, resources, constraints, the critical path, remaining float and productivity
Method
  • Each answer scores 2, 1 or 0; the share of available points sets the band.
Limitations
  • Self-reported; use the guided recovery pathway for a structured review.
Suggested actions
  • Ask for resourced logic behind every recovered date.
  • Keep acceptance to “noted” until the recovery is evidenced.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
Related
Expertise: Project Controls · Reference: Earned value standards · Case study: Hudayriyat West programme · 100-Point Framework · Not sure where to start? Decision Centre

Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →