Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Calculator · Planning and schedule control

Critical Path Stability Monitor

How much the critical path changes between updates, what joined and left, and how completion moved.

Enter your own figures in any currency or unit, used consistently. The form opens with a fictional worked example so you can see how it reads. Calculations run in your browser; nothing is sent or stored. It does not connect to any scheduling or cost system.

Updates, oldest first

Calculator How this tool works: inputs, method and limitations
Purpose
Spot critical path migration and instability across a run of programme updates.
Intended user
Planners, schedule reviewers and delay analysts reviewing monthly updates.
Output
Similarity and status for each pair of updates, activities joining and leaving, completion movement, core critical activities and runs of later forecasts.
How the result is produced
Calculated.
PCMS discipline
Planning and scheduling · Volume 2: Planning, Scheduling and Progress Management
Learn the method
Planning and scheduling fundamentals (Foundation pathway)
Worked example
The tool opens with a fictional worked example; “Load example” restores it and “Clear” resets every input. Results can be downloaded as CSV or printed.
Inputs
  • For each update, oldest first: a label, the forecast completion (day number or days late) and the IDs of the critical activities
Method
  • Similarity between consecutive updates = activities critical in both ÷ activities critical in either (Jaccard index).
  • Stable at 80% and above, shifting at 50% and above, migrated below 50%. Volatility = 1 − average similarity.
  • Core critical activities are critical in at least 75% of updates.
Limitations
  • Depends on consistent activity IDs between updates.
  • Says that the path moved, not why: check logic, constraints and progress for each migration.
Suggested actions
  • Require a narrative for every migration.
  • Escalate when completion moves later in consecutive updates.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.