Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Diagnostic · Baseline

5-Minute Baseline Check

Seven quick questions on whether a baseline is a programme you could actually manage against — before you accept it as the control reference. It runs entirely in your browser — nothing is sent or stored. It is a practitioner’s prompt, not an engineering or contractual certification.

01Is the baseline formally accepted or approved under the contract?
02Is the logic complete — no activities left with open ends (missing predecessors or successors)?
03Are hard constraints minimal and justified, with dates driven by logic rather than constraints?
04Do the durations and sequence reflect how the work will actually be built?
05Does the critical path make engineering sense — running through the work that really drives completion?
06Is it coded (and calendar/resource-loaded as needed) so you can report and measure against it?
07Can you measure progress against it in a way that will mean something each cycle?
Check How this tool works: inputs, method and limitations
Purpose
Separate “accepted” from “fit to manage against” before a baseline becomes the contract yardstick.
Intended user
Employer and PMC reviewers, and contractor planners preparing a baseline submission.
Output
A band, an interpretation and the questions to look at first.
How the result is produced
Self-assessment, rule-based. Results depend on ratings or estimates you enter; they are not measured performance.
PCMS discipline
Baseline management and control · Volume 2: Planning, Scheduling and Progress Management
Learn the method
How to review a P6 baseline (Practitioner pathway)
Inputs
  • Seven yes / partly / no answers on acceptance, logic, constraints, durations, critical path, coding and measurability
Method
  • Each answer scores 2, 1 or 0; the share of available points sets the band (75% and above strong, 40% and above needs attention).
Limitations
  • Self-reported; a prompt for a proper baseline review, not a substitute for one.
Suggested actions
  • Close logic and constraint gaps before acceptance.
  • Record what was accepted and on what conditions.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
Related
Expertise: Schedule Assurance · Reference: Schedule assessment frameworks · Case study: Schedule quality 25% to 83% · 100-Point Framework · Not sure where to start? Decision Centre

Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →