Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Diagnostic · Claims & EOT

EOT Triage

Seven quick questions to see whether an EOT claim has the ingredients of a defensible position — and what to examine first. It runs entirely in your browser — nothing is sent or stored. It is a practitioner’s prompt, not an engineering or contractual certification.

01Is each delay event tied to a specific, valid contract mechanism?
02Was contractual notice served — and served in time?
03Is there a demonstrable cause: an event, with a date, in the contemporaneous record?
04Does the programme show the event affecting the critical path to the affected milestone?
05Is the effect measured in the programme (a fragnet or impacted update), not just asserted in a narrative?
06Have concurrency and the contractor's own delay been considered?
07Are the time claim and the money claim being kept separate?
Check How this tool works: inputs, method and limitations
Purpose
Decide where to start reviewing an extension-of-time submission.
Intended user
Engineers, PMC reviewers and contractor claims teams.
Output
A band, an interpretation and the weakest points to examine first.
How the result is produced
Self-assessment, rule-based. Results depend on ratings or estimates you enter; they are not measured performance.
PCMS discipline
Claims, delay analysis and EOT management · Volume 2: Planning, Scheduling and Progress Management
Learn the method
Time Impact Analysis: a practical guide (Advanced pathway)
Inputs
  • Seven yes / partly / no answers on contract mechanism, notice, cause, critical-path effect, measured effect, concurrency, and keeping time and money apart
Method
  • Each answer scores 2, 1 or 0; the share of available points sets the band.
Limitations
  • Not a determination of entitlement; the contract, the law and the evidence decide that.
Suggested actions
  • Request the missing records before running any analysis.
  • Agree the analysis method and its basis early.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
Related
Expertise: Claims and extension of time · Reference: AACE forensic schedule analysis · Case study: 291 days claimed, 64 approved · 100-Point Framework · Not sure where to start? Decision Centre

Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →