Calculator · Reporting and governance
Programme Reporting Compliance Checker
Check a monthly report against twelve required contents, weighted, with timeliness.
Enter your own figures in any currency or unit, used consistently. The form opens with a fictional worked example so you can see how it reads. Calculations run in your browser; nothing is sent or stored. It does not connect to any scheduling or cost system.
Calculator How this tool works: inputs, method and limitations
- Purpose
- Test whether a contractor or project report contains what decisions need, and list what to request.
- Intended user
- PMC reviewers, controls leads and anyone receiving monthly reports.
- Output
- Compliance score and rating, essential content missing, items to request, incomplete items and timeliness.
- How the result is produced
- Rule-based check.
- PCMS discipline
- Reporting, dashboards and decision intelligence · Volume 3: Reporting and Performance Management
- Learn the method
- What senior management actually needs (Foundation pathway)
- Worked example
- The tool opens with a fictional worked example; “Load example” restores it and “Clear” resets every input. Results can be downloaded as CSV or printed.
- Inputs
- For each of twelve contents: provided, partly, missing or not required
- Days late against the reporting deadline
- Method
- Weighted score: essential items 3, core items 2, supporting items 1; partly counts half; not required is excluded.
- Compliant at 90% and above, largely compliant at 70%, partly compliant at 50%.
- Limitations
- Checks that content is present, not that it is accurate.
- The list is generic; adapt it to the contract’s reporting requirements.
- Suggested actions
- Send the missing-items list with the review comments.
- Track compliance month to month in the contractor scorecard.
- How to read the result
- The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
- Related
- Expertise: Digital Project Controls · Reference: Programme governance standards · Case study: Hudayriyat West programme · 100-Point Framework · Not sure where to start? Decision Centre
Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →