Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Calculator · Interface management

Interface Management Tracker

Need and forecast dates between packages, overdue and at-risk interfaces, and what to escalate.

Enter your own figures in any currency or unit, used consistently. The form opens with a fictional worked example so you can see how it reads. Calculations run in your browser; nothing is sent or stored. It does not connect to any scheduling or cost system.

Interfaces

Calculator How this tool works: inputs, method and limitations
Purpose
Keep the hand-offs between contracts visible, dated and owned.
Intended user
Interface managers, PMC teams and programme controls leads on multi-contract programmes.
Output
Status and slip for each interface, counts by status, escalations, late interfaces by giving party and the on-time rate of closed interfaces.
How the result is produced
Calculated.
PCMS discipline
Interface management · Volume 2: Planning, Scheduling and Progress Management
Learn the method
One standard across contracts (Controls System) (Management pathway)
Worked example
The tool opens with a fictional worked example; “Load example” restores it and “Clear” resets every input. Results can be downloaded as CSV or printed.
Inputs
  • Data date
  • Each interface: giving and receiving party, need date, forecast or actual date, open or closed, critical or not
Method
  • Slip = forecast (or actual) date − need date.
  • Overdue: open and need date passed. At risk: open with forecast after need date. Due in 30 days: open, on time, need date within 30 days.
  • Escalate critical interfaces that are overdue or at risk.
Limitations
  • Dates must be entered as YYYY-MM-DD.
  • Does not test the programme effect of a late interface; use the programme or the Change Impact Assessment for that.
Suggested actions
  • Put every interface date into both parties’ programmes.
  • Review overdue and at-risk interfaces at the weekly coordination meeting.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
Related
Expertise: Programme Management and Governance · Reference: Programme governance standards · Case study: Hudayriyat West programme · 100-Point Framework · Not sure where to start? Decision Centre

Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →