Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Module · Programme management

Programme Roadmap Generator

Phases, component projects, milestones, gates, benefits and assurance reviews on one timeline, with a 90-day controls transformation template.

Enter your own figures in any currency or unit, used consistently. The form opens with a fictional worked example so you can see how it reads. Calculations run in your browser; nothing is sent or stored. It does not connect to any scheduling or cost system.

Templates:

Roadmap items

Phases and activities have a start and an end; milestones, gates, benefits and assurance reviews use the start date only. “Depends on” takes item IDs separated by commas.

Module How this tool works: inputs, method and limitations
Purpose
Communicate the shape of a programme, or of a controls improvement, on one page, and check that it hangs together.
Intended user
Sponsors, programme directors, PMO and controls leads.
Output
A timeline, a roadmap register and a list of issues to resolve before issuing.
How the result is produced
Rule-based checks on items you enter.
PCMS discipline
Programme and project governance · Volume 1: Governance
Learn the method
Project controls operating models (Leadership pathway)
Inputs
  • Roadmap items: lane, type, name, start and end dates, dependencies, owner and success criterion
Method
  • Phases and activities drawn as bars; milestones, gates, benefits and assurance reviews as markers; gates marked across all lanes.
  • Flags items that start before the items they depend on end, dependencies that do not exist, items without an owner, and gates, milestones and benefits without a success criterion.
Limitations
  • Does not calculate a critical path; the integrated schedule belongs in a scheduling tool.
  • The 90-day template is a starting point; tailor it to the gaps found.
  • An educational tool: not affiliated with PMI, not accredited training and not exam or certification preparation.
Suggested actions
  • Give every gate written success criteria.
  • Show benefits on the same timeline as delivery.
  • Revisit the roadmap at each gate.
How to read the result
The result is indicative: a structured prompt for professional judgement, not a determination. Use it to decide what to check next, then confirm against the programme, the records and the contract.
Related
Expertise: Programme Management and Governance · Reference: Programme governance standards · Case study: 16 contracts under one standard · 100-Point Framework · Not sure where to start? Decision Centre

Runs in your browser; nothing is sent to a server. A practitioner’s aid, not a certification or a contractual determination. See how the measures combine in the Programme Intelligence Dashboard. All tools →