Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

US Government Accountability Office

The GAO schedule and cost guides

GAO Schedule Assessment Guide: Best Practices for Project Schedules (GAO-16-89G)December 2015; no later edition · Government guidance · FreeOfficial source →
Cost Estimating and Assessment Guide: Best Practices for Developing and Managing Program Costs (GAO-20-195G)March 2020 (updates the 2009 guide) · Government guidance · FreeOfficial source →
Edition checked 02-Nov-26.

01What it covers

How auditors judge whether a programme’s schedule and cost estimate can be relied on. The schedule guide sets out ten best practices; the cost guide sets out an estimating process and four characteristics of a reliable estimate: comprehensive, well documented, accurate and credible.

02Why it matters

They are free, rigorous and written for scrutiny by people outside the project team. Their vocabulary lets a controls lead explain to a board why a date or a forecast should, or should not, be trusted.

03Key principles

  • A schedule is reliable when it is comprehensive, well constructed, credible and controlled.
  • A cost estimate is reliable when it is comprehensive, well documented, accurate and credible.
  • Credibility needs testing: sensitivity, risk and uncertainty analysis, and comparison with an independent view.
  • Schedules and estimates must be updated with actual performance, and the baseline maintained under change control.

04Practical application

  • Use the four schedule characteristics as headings in the monthly assurance report, so findings roll up into terms executives recognise.
  • Test any reported estimate at completion against the four cost characteristics before it reaches the board.
  • Record the basis of the schedule and of the estimate, so each can be reproduced and audited.

05Common mistakes

  • Producing a single-point forecast with no statement of its uncertainty.
  • Treating an estimate as reliable because it is detailed, when its assumptions are undocumented.
  • Updating dates without updating logic, so the schedule drifts from the work.
Guidance, contract and law. GAO guides are written for US federal programmes and auditors. They are not binding on other projects, but their principles transfer directly to major capital programmes anywhere.

06PCMS discipline

07Related tools

08Further reading

Written in my own words to explain principles; it does not reproduce the publication and implies no endorsement by US Government Accountability Office. Not legal advice.