Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Home / Insights / Setting Up Project Controls

Series guide

Setting Up Project Controls on a Mega-Programme

The order things happen in — from the first day to a steady controls function.

Drawn from mobilising controls on a large multi-contractor UAE development. Each part covers one layer of the set-up — what it is, why it comes when it does, and what it costs to skip. One principle runs through all of it: reports are the output of a controls function, not the proof you have one.

The set-up sequence GovernStructureStandardiseGateReport

0 of 10 published · a new part each Friday

Foundations

The first 90 days, the decision map and the plan everything else runs on.

Part 1 · publishes 07-May-27

The First 90 Days: What to Set Up Before Anyone Asks for a Report

Foundations first. Reports are the output, not the opening move.

Part 2 · publishes 14-May-27

Governance First: Who Decides What, and on What Evidence

Controls measures; governance decides. Build the decider first.

Part 3 · publishes 21-May-27

The Project Controls Plan: The Document Everyone Skips and Later Regrets

The cheapest document to write, the most expensive to skip.

Structure & Standards

The WBS and coding, one standard for every contractor, and the baseline gate.

Part 4 · publishes 28-May-27

WBS and Coding: The Structure That Decides What You Can Ever Report

You can only report a dimension you built into the structure.

Part 5 · publishes 04-Jun-27

One Standard, Many Contracts: Making Different Contractors Report the Same Way

A single reporting backbone across every package.

Part 6 · publishes 11-Jun-27

Baseline Acceptance: The Gate That Protects the Next Three Years

The gate that makes later delay analysis possible at all.

Running Controls

Change control, the reporting rhythm, the team, and knowing when it works.

Part 7 · publishes 18-Jun-27

Change Control: Keeping the Baseline Honest While the Project Moves

A living baseline with an audit trail.

Part 8 · publishes 25-Jun-27

The Reporting Rhythm: Weekly, Monthly, Board — and What Each One Is For

Weekly, monthly, board — and what each one is for.

Part 9 · publishes 02-Jul-27

Building the Controls Team: Who You Need, and in What Order

Build to the function, not the org chart, and in the right order.

Part 10 · publishes 09-Jul-27

When Controls Are Working: Outcomes, Not Activity

Busy produces reports; working changes decisions. The difference is surveillance.

Related series: The Employer’s Side of the Table How the Employer and its consultant review what contractors submit — the other side of the gates this series sets up.

Practitioner commentary based on the author’s practice and recognised frameworks (AACE International, PMI, ISO). Set-up, sequence and governance depend on the specific programme, contracts and delivery model.