Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Aviation · Abu Dhabi, UAE

Abu Dhabi International Airport — Airfield

Lead scheduling and controls on airfield infrastructure delivered alongside live airport operations.

PlanningSchedule Assurance
Aerial view of airfield runways and taxiways at Abu Dhabi International Airport Abu Dhabi, UAE · AED 1.8B

Project at a Glance

Location
Abu Dhabi, UAE
Sector
Aviation
Value
AED 1.8B
Role
Lead Scheduler
Delivery
Jacobs
Period
2015 — 2019

Airfield infrastructure sits at the sharp end of aviation delivery — carried out to strict operational and safety standards, in tightly controlled windows, without disrupting flights. The scope spanned runways and the tunnels beneath them, aircraft parking stands, radar towers, fire stations and airfield lighting control systems (ALCMS) — not the passenger terminals.

The controls challenge

That environment leaves no room for a loose schedule. As Lead Scheduler within the Jacobs team, I led phased planning and schedule assurance built around live-operations constraints, reporting delivery and interface risk to leadership.

The insight

In aviation, precision in the plan is a safety property, not just a controls one. The schedule is part of how operations stay protected.

Project Gallery

This page describes Rishi Javeri's project-controls role within the programme and does not imply sole delivery of the asset. Figures are drawn from Rishi's own record and are subject to confirmation of disclosable scope; no confidential schedules, dashboards or commercially sensitive material are shown. Imagery to be supplied as owned or licensed only.