Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Rail & Metro · Dubai, UAE

Dubai Metro Route 2020

Project controls and schedule assurance on a fixed-opening rail extension over a live network.

Schedule AssuranceInterfaceEOT
A Route 2020 metro station under construction, its canopy trusses raised over the platform Dubai, UAE · RTA · AED 148.7M

Project at a Glance

Location
Dubai, UAE
Sector
Rail & Metro
Value
AED 148.7M
Role
Lead Scheduler
Delivery
Jacobs
Period
2015 — 2019

Route 2020 extended the Dubai Metro Red Line toward the Expo site — a major rail programme with the twin pressures of a fixed opening and a live operating network that could not be disrupted.

The controls challenge

Rail programmes concentrate risk at their interfaces: civils, systems, testing and commissioning all converge. As Lead Scheduler within the Jacobs team, I integrated contractor schedules, scrutinised critical-path and interface milestones, and gave leadership an evidence-based view against the opening date.

The insight

On rail, the schedule is only as strong as its interfaces. Controls earn their keep by making the handovers between disciplines impossible to ignore.

Project Gallery

This page describes Rishi Javeri's project-controls role within the programme and does not imply sole delivery of the asset. Figures are drawn from Rishi's own record and are subject to confirmation of disclosable scope; no confidential schedules, dashboards or commercially sensitive material are shown. Imagery to be supplied as owned or licensed only.