Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Major Programme · Dubai, UAE

Expo 2020 Dubai

Employer-side schedule assurance protecting a fixed opening date across highly interfaced packages.

Schedule AssurancePlanningCritical Path
Aerial view of the Expo 2020 Dubai site with the Al Wasl dome at its centre Dubai, UAE · Jacobs Mace JV · AED 1.19B direct scope

Project at a Glance

Location
Dubai, UAE
Sector
Major Programme
Value
AED 1.19B direct scope
Role
Scheduling Manager
Delivery
Jacobs Mace JV
Period
2019 — 2020

Expo 2020 Dubai was one of the largest events ever staged in the region — a vast, highly interfaced build programme with one defining characteristic: a fixed, globally announced opening date that could not move.

The controls challenge

When the deadline is immovable, schedule assurance becomes the central risk function. As Scheduling Manager within the Jacobs Mace JV, I provided Employer-side assurance and critical-path governance across interfaced packages — testing contractor programmes and reporting the honest position, not the comfortable one.

The insight

On a fixed-deadline programme, the most valuable thing controls offers is an uncomfortable truth delivered early. Assurance that only confirms the optimistic view is worse than none.

Project Gallery

This page describes Rishi Javeri's project-controls role within the programme and does not imply sole delivery of the asset. Figures are drawn from Rishi's own record and are subject to confirmation of disclosable scope; no confidential schedules, dashboards or commercially sensitive material are shown. Imagery to be supplied as owned or licensed only.