Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Sports & Entertainment · Al Ain, UAE

Hazza Bin Zayed Stadium

Integrated planning on a fast-track stadium, with EOT and forensic claims strategy supporting arbitration.

PlanningEOTClaims
Interior of Hazza Bin Zayed Stadium showing the stands and pitch Al Ain, UAE · AED 698M

Project at a Glance

Location
Al Ain, UAE
Sector
Sports & Entertainment
Value
AED 698M
Role
Planning Engineer
Delivery
BAM International
Period
2012 — 2014

A landmark 25,000-seat football stadium in Al Ain, delivered on a demanding fast-track programme that compressed design, procurement and construction into overlapping fronts.

The controls challenge

Fast-track work multiplies interface risk and the potential for delay and change. As Planning Engineer with BAM International, I delivered integrated planning and controls, and developed the EOT and forensic claims strategy — capturing cause, effect and evidence as events unfolded.

The insight

Entitlement is built during delivery, not after it. The contemporaneous record a planner keeps under fast-track pressure is exactly the record a claim later depends on.

Project Gallery

This page describes Rishi Javeri's project-controls role within the programme and does not imply sole delivery of the asset. Figures are drawn from Rishi's own record and are subject to confirmation of disclosable scope; no confidential schedules, dashboards or commercially sensitive material are shown. Imagery to be supplied as owned or licensed only.