Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Urban Development · Abu Dhabi, UAE

Hudayriyat West Island Development

Employer-side project controls, programme governance and performance assurance across concurrent construction packages.

Project ControlsSchedule AssuranceDigital TransformationEOTPower BI
Aerial masterplan view of the Hudayriyat West island development in Abu Dhabi, showing the velodrome, coastline, parkland and neighbourhoods Abu Dhabi, UAE · Modon Properties · AED 28.1B

Project at a Glance

Location
Abu Dhabi, UAE
Sector
Urban Development
Value
AED 28.1B
Role
Senior Programme Controls Manager (EllisDon PMC)
Delivery
EllisDon (PMC)
Period
2023 — Present

Hudayriyat West is a major island-development programme forming part of Abu Dhabi’s wider Hudayriyat Island vision. Working Employer-side within the EllisDon PMC and reporting to the Programme Director, I lead the integrated controls function across its concurrent packages.

Outcome

A seven-volume Project Controls Management System set the common standard, and a Python-based Primavera P6 assurance engine lifted schedule quality on one package programme from around 25% to over 83% — turning schedule quality from a monthly argument into a baseline everyone worked to. On the programme’s velodrome project, forensic delay analysis reduced a contractor’s Extension of Time position from 426 days to 91 on the evidence, protecting the Employer’s time and contractual position.

Project Gallery

This page describes Rishi Javeri's project-controls role within the programme and does not imply sole delivery of the asset. Figures are drawn from Rishi's own record and are subject to confirmation of disclosable scope; no confidential schedules, dashboards or commercially sensitive material are shown. Imagery to be supplied as owned or licensed only.