Expertise

Project ControlsPlanning and Primavera P6Schedule AssuranceEOT ClaimsForensic Delay AnalysisProgramme ManagementPMO LeadershipDigital Project ControlsAll expertise

Framework

Project Controls Management System100-Point Schedule Assurance FrameworkHow I WorkOperating PrinciplesImplementation ChecklistsMaturity Model

Tools

Project Controls IntelligenceDecision Centre: start hereDirector’s 10-Minute ReviewForensic Delay LabProgramme DashboardProgramme SimulatorRisk and Early WarningExecutive Review GeneratorSchedule Assurance ChallengeProgramme Management toolsChecklists and templates

Academy

Learning pathwaysProfessional ReferencesPrimavera P6 GuidesThe SCL Protocol seriesGlossary

Insights

ArticlesCase StudiesProjectsDirector’s PlaybookRed Flags and Failure AtlasLessons from Major ProgrammesClaims and Delay articles

About

AboutExecutive ProfileDownload Executive CVLinkedIn
Search

Searches articles, case studies, guides and tools on this site. Runs in your browser — nothing is sent anywhere.

Primavera P6 Practical Guides

Baseline vs Current Programme

The reference and the live schedule — keep them distinct.

What it is

The baseline is the accepted, frozen reference programme; the current (live) schedule is where progress is recorded and the forecast lives. Variance and delay analysis depend on comparing the two.

Why it matters

Blur the two and you lose your reference point. Every meaningful measurement — slippage, variance, delay — is the current schedule read against a fixed baseline.

In practice

  • Assign the baseline in P6 (Maintain Baselines) and set it as the Project Baseline — an unassigned baseline gives you no variance at all.
  • Keep the baseline effectively read-only; re-baseline only on formal approval, and record when and why.
  • Use variance columns (BL Project Finish vs Finish, BL Start) to read slippage activity by activity.
  • A re-baseline resets the reference — do it deliberately, never to quietly absorb slippage.

Watch for

  • A working schedule with no baseline assigned — variance impossible.
  • Re-baselining every cycle, erasing the history a claim needs.
  • Comparing against the wrong baseline (a secondary baseline, not the project baseline).